Laserfiche WebLink
<br /> <br />Wildcat Mining Corporation <br />May Day and Idaho Mine and Mill Application <br />112(d) Permit – Technical Revision No. 1 <br />May Day and Idaho Mine <br />M-1981-185 <br />Revised June 30th, 2016 <br />6 <br />5) Conclusions <br /> <br />Portal and highwall stabilization conforms to the approved TR (See photo documentation) <br />including: <br />• Removing debris and loose material from the area immediately above the Chief manway <br />portal; <br />• Reconstructing a stable highwall above the Chief; <br />• Extended a 66 inch pipe from inside the Chief portal to the toe of the backfilled slope; <br />• Stabilized the existing access road to May Day 3 and the Chief access road; <br />• Interim BMPs were installed prior LDG channel restoration activities; and <br />• Vegetation and final BMPs will be installed when the LDG drainage channel is restored. <br /> <br />6) Maintenance Activities include: <br /> <br />• Maintaining stormwater runoff control structures; <br />• Monitoring and maintaining site vegetation and <br />• Annually reporting site observations; <br />o Head scarp stability; <br />o Bench stability; and <br />o Access road stability <br /> <br />