Laserfiche WebLink
r� <br /> o Transit Mix Concrete Co. <br /> DRMS COMMENTS-PETER HAYS-REVIEW OF BLASTING PLAN <br /> 1. Comment: The Applicant did not provide a pre-blasting survey plan in the initial Blast Plan <br /> submitted with the permit application package. Please provide the Division a copy of the <br /> pre-blasting survey plan. <br /> Response: The proposed Pre-Blasting Survey Plan is included in Exhibit D. <br /> 2. Comment: The Applicant did not provide a flyrock control plan in the initial Blast Plan <br /> submitted with the permit application package. Please provide the Division with a plan to <br /> control flyrock from damaging nearby permanent man-made structures. <br /> Response: The Blasting Plan in Exhibit D has been revised to address this comment. <br /> 3. Comment: The Applicant states all blasts will be monitored using seismic instruments. The <br /> seismic instruments will measure ground vibration and peak particle velocity. Please provide <br /> the Division with the proposed maximum peak particle velocities in inches/second based on <br /> the distance from the blast site to all structures within one mile of the blast location. <br /> Response: The monitoring section in the Blasting Plan in Exhibit D has been revised to <br /> address this comment. <br /> 4. Comment: The Applicant states all blasts will be monitored using seismic instruments. The <br /> seismic instruments will measure ground vibration and peak particle velocity. Please commit <br /> to recording the peak particle velocities in three mutually perpendicular directions from the <br /> blasting site. The maximum peak particle velocity shall be the largest of any of the three <br /> measurements. <br /> Response: The monitoring section in the Blasting Plan in Exhibit D has been revised to <br /> address this comment. <br /> 5. Comment: The Applicant states all blasts will be monitored using seismic instruments. <br /> Please provide the Division with the location off all seismic instruments. <br /> Response: The monitoring section in the Blasting Plan in Exhibit D has been revised to <br /> address this comment. <br /> 6. Comment: The Applicant states all blasts will be monitored with microphones to measure <br /> air over pressure (air blast) and noise. Please provide the Division with the lower frequency <br /> limit of the planned measuring system in Hertz (Hz)and maximum level in decibels (dB) for <br /> each frequency limit. <br /> Response: The monitoring section in the Blasting Plan in Exhibit D has been revised to <br /> address this comment. <br /> Hitch Rack Ranch Quarry(M-2016-010) <br /> Response to Comments—July 14, 2016 <br />