Laserfiche WebLink
significant environmental harm to the health or safety of the public; and, <br /> b. Utilizing any methods specified in the permit by the Division in approving alternative <br /> methods of compliance with the Act and in accordance with the provisions of <br /> 2.07.6(2)(m) and Rule 4. <br /> 5. The operator shall pay all reclamation fees required by 30 CFR, Chapter VII, Subchapter <br /> R(1989), for coal produced under the permit for sale, transfer or use, in the manner required <br /> by that Subchapter. <br /> 6. Within thirty days after a cessation order is issued under 5.03.2(1), for operations conducted <br /> under the permit, except where a stay of the cessation order is granted and remains in effect, <br /> the permittee shall either submit to the Division the following information, current to the date <br /> the cessation order was issued, or notify the Division in writing that there has been no change <br /> since the immediately preceding submittal of such information: <br /> a. Any new information needed to correct or update the information previously <br /> submitted to the Division by the permittee under 2.03.4(3); or <br /> b. If not previously submitted, the information required from a permit applicant by <br /> 2.03.4(3). <br /> 7. The permittee shall conduct surface coal mining and reclamation operations only on those <br /> lands that are specifically designated as the permit area on the maps and in the legal <br /> description submitted with the application. Areas disturbed and affected by surface coal <br /> mining and reclamation operations shall be contained within the boundaries authorized on <br /> permit application maps for the term of this permit and shall be limited to those areas subject <br /> to the performance bond in effect pursuant to these rules. <br /> 8. The permittee shall conduct all surface coal mining and reclamation operations only as <br /> described in the approved application, except as otherwise directed by the Division in this <br /> permit. <br /> 9. The permittee shall comply with the terms and conditions of this permit, all applicable <br /> performance standards of the Act, and the requirements of these Rules. <br /> 10. Continuous,uninterrupted bond coverage shall be in effect at all times, and an adequate bond <br /> amount shall be maintained pursuant to the requirements of Rule 3.02.2. Operating without a <br /> bond is a violation of a condition upon which this permit is issued. <br /> 11. If analyses of the mining and reclamation operation and the data collected through <br /> monitoring and experimentation by the operator or monitoring by the Division indicate in the <br /> judgment of the Division that the operation will not be able to comply with the requirements <br /> of the Act and lawful rules and regulations thereunder, operator hereby agrees to exercise its <br /> best efforts, after consulting with the Division, to modify the plans prospectively to correct <br />