My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-18_REVISION - M2008082
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008082
>
2016-07-18_REVISION - M2008082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:21 PM
Creation date
7/19/2016 8:12:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Revision
Doc Date
7/18/2016
Doc Name
Amendment Application
From
Hart Environmental
To
DRMS
Type & Sequence
AM1
Email Name
ECS
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division has identified four approaches for operators; <br /> 1, file a financial warranty that will ensure backfilling of the pit to cover the exposed ground water to a <br /> depth of two feet above the static ground water level or, <br /> 2. Obtain a court approved augmentation plan prior to exposing ground water or, <br /> 3. File a financial warranty to cover the cost of installing a day liner or slurry wall that meets the <br /> Division of Water Resources requirements for preventing ground water exposure or, <br /> 4. Obtain approval from the Division of Water Resources that acknowledges compliance with the SEO's <br /> requirements pursuant to§37-90-137(11). <br /> The Division will work with operators on an individual basis as they move to knplement one of these plans. it <br /> is likely that options 1 and 3 will require the submittal of a technical revision or an amendment to the existing <br /> permit depending on the nature of the current mining and reclamation plan and the proposed changes. <br /> increased financial warranties,as a result of these modifications,may be posted In a phased manner not to <br /> exceed three years. Amendments or revisions currently under review will be required to be approved by <br /> April 30,2011 and may use the phased financial warranty approach described above. New applications going <br /> forward or presently under review by the Division will be required to meet the requirements of one of the <br /> options 1-4 at the time of application approval. failure of affected operators to Initiate contact with the <br /> Division and gain compliance as described above could result in an enforcement action being Issued by the <br /> Division. <br /> If you have any questions,please contact Tony Waldron at 303-866-3567,extension 8150. <br /> CC,. Permit Id Site Name <br />
The URL can be used to link to this page
Your browser does not support the video tag.