Laserfiche WebLink
Ms. Jennifer S. Lindhal Page 9 <br /> June 8, 2016 <br /> 19. In accordance with amendments to Section 525-8-202-(7), C.R.S. and "Senate Bill 89-181 Rules and <br /> Regulations" adopted on February 4, 1992, the State Engineer shall determine if this substitute <br /> water supply plan is of a quality to meet requirements of use to which the senior appropriation <br /> receiving the substitute supply has normally been put. As such, water quality data or analyses may <br /> be requested at any time to determine if the requirement of use of the senior appropriator is met. <br /> 20. The decision of the State Engineer shall have no precedential or evidentiary force, shall not create <br /> any presumptions, shift the burden of proof, or serve as a defense in any water court case or any <br /> other legal action that may be initiated concerning the SWSP. This decision shall not bind the State <br /> Engineer to act in a similar manner in any other applications involving other plans or in any <br /> proposed renewal of this plan, and shall not imply concurrence with any findings of fact or <br /> conclusions of law contained herein, or with the engineering methodologies used by the Applicant. <br /> If you have any questions concerning this approval, please contact Ioana Comaniciu in Denver at <br /> (303) 866-3581 or Dean Santistevan in Greeley at (970) 352-8712. <br /> Sinc rely, , �L <br /> Jeff eatherage, P.E., <br /> hie of Water Supply <br /> Attachment: Figure 1 and 2 <br /> Tables 1, 2, and 3 <br /> City of Aurora Lease <br /> Letter from DBMS dated April 30, 2010 <br /> Administration Protocol "Augmentation Plan Accounting, Division One - South Platte <br /> River" <br /> cc: Dean Santistevan, Assistant Division Engineer, Dean.Santistevan@state.co.us <br /> 810 9`h Street, 2nd Floor, Greeley, Colorado 80631, 970-352-8712 <br /> Brent Schantz, River Operations Et Compact Coordinator, Brent.SchantzCstate.co.us <br /> Division of Reclamation Mining and Safety <br /> JD/JMW/idc <br />