My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-18_REVISION - M2008082
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008082
>
2016-07-18_REVISION - M2008082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:21 PM
Creation date
7/19/2016 8:12:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Revision
Doc Date
7/18/2016
Doc Name
Amendment Application
From
Hart Environmental
To
DRMS
Type & Sequence
AM1
Email Name
ECS
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Jennifer S. Lindhal Page 7 <br /> June 8, 2016 <br /> for reasons of 600 foot spacing, or any other legitimate reason, approval of this SWSP will be <br /> cancelled. <br /> 3. The total surface area of the groundwater exposed at the Morton Lakes and Holton Lakes must <br /> not exceed 16.9 acres for Stage 1, 2 acres for Stage 7 and 2 acres for Stage 2. Should the total <br /> surface area exposed exceed those amounts, an amendment request shalt be promptly filed with <br /> this office. <br /> 4. The total amount of ground water to be appropriated from each of the pits shall not exceed the <br /> values listed in Table C of this approval. <br /> 5. Total consumption at the Morton Lakes and Holton Lakes must not exceed these aforementioned <br /> amounts unless an amendment is made to this SWSP. <br /> 6. Approval of this SWSP is for the purposes as stated herein. This office must first approve any <br /> additional uses for the water. <br /> 7. All pumping for dust control shall be measured in a manner acceptable to the division engineer. <br /> 8. The replacement water that is the subject of this SWSP cannot be sold or leased to any other <br /> entity. As a condition of subsequent renewals of this SWSP, the replacement water must be <br /> appurtenant to this site until a plan for augmentation is obtained. All replacement water must be <br /> concurrent with depletions in quantity, timing, and locations. <br /> 9. Adequate accounting of depletions and replacements must be provided to the division engineer in <br /> Greeley (DivlAccountinp@state.co.us) and the water commissioner (Brent Schantz at <br /> Brent.Schantz@state.co.us) on a monthly basis. All amounts shalt be in acre-feet. All submitted <br /> accounting must conform to the Administration Protocol "Augmentation Plan Accounting - <br /> Division One, South Platte River" (attached). <br /> In addition, the Applicant shall verify that the entity making replacements has included the <br /> Applicant on their accounting and submitted their accounting to the division office and the water <br /> commissioner; for this SWSP, that entity is the City of Aurora. <br /> 10. Conveyance loss for delivery of augmentation water to the point of depletion on the South Platte <br /> River is subject to assessment and modification as determined by the division engineer. <br /> 11. The division engineer, or his designated representative, will administer at[ such water <br /> transported in the South Platte River or its tributaries under this SWSP, including water for <br /> replacement of depletions, past intervening headgates to ensure that such water is not <br /> intercepted or otherwise diminished in quantity by diversion, use or other interference by <br /> intervening water rights and to assure that such water remains available and suitable for <br /> Applicant's uses under this SWSP, except when any intervening headgate is diverting the entire <br /> flow of ("sweeping") the river. In the event that delivery past headgates which sweep the river <br /> requires the installation of a bypass structure or the use of an existing bypass structure by <br /> agreement with a third-party, Applicant is responsible for either installing a new bypass structure <br /> with a continuous recording measuring device(s) as approved by the Water Commissioner or <br /> securing an agreement with a third-party to use an existing bypass structure and providing such <br /> information and agreement to the division engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.