Laserfiche WebLink
Exhibit D - Reclamation Plan: We will perform concurrent partial reclamation of the <br /> trench(s) as we mine and perform a final reclamation of all trenches at the close of <br /> each mining project <br /> All disturbed trenched areas will be back-filled, re-contoured and re-seeded with US <br /> Forest approved seed mixtures and planted with ponderosa trees if applicable at the <br /> end of each project period. The road segments will be roughed with the excavator <br /> upon completion and exiting of the project. The road segment will then also be re- <br /> seeded with USDA approved seed mix. <br /> USDA approved seed mix is as follows: <br /> Crystal Creek-Native Revest Seed Mix <br /> Species Common Name Percent of mix <br /> Elymtts trachycaulzis slender wheatgrass 25 <br /> Bromus marginatzis mountain brome 25 <br /> Festuca arizonica Arizona fescue 15 <br /> Poa fendleriana muttongrass 10 <br /> Elymus elymoides squirreltail 5 <br /> Muhlenbergia montana mountain muhly 5 <br /> Koeleria macrantha junegrass 5 <br /> Pascopyrum smithii western wheatgrass 5 <br /> Bouteloua gracilis blue grama 5 <br /> A seeding rate of 40 lbs/acre using broadcast method of application. <br /> At the termination of the operations all disturbances will receive a final re-grading, <br /> re-seeding, re-planting and monitored for one calendar year or until 70% re-growth <br /> is observed. This includes all prior disturbances within bonded area of claim. <br /> Reclamation Estimate <br /> Direct Cost: <br /> i. Backfilling: 1,000 X$ (cost per yard) =Total $ 3,000. <br /> ii. Grading: 176 X $ (cost per yard) Total $1,050. <br /> iii. Topsoil: 110 X $ (cost per yard) =Total $500. <br /> iv. Seeding: 3 acres X $ 400 =Total $ 1,200 <br /> V. Mobilization: 1 excavator X $ 1,000= $1,000. <br /> Total $ 6,750. <br /> Direct Cost Subtotal: $ 6,750. <br /> Division's total overhead cost: 6,750X 18.5% <br /> Division's Total cost: $7,998.75 <br />