Laserfiche WebLink
TABLE 3-Continued <br /> Well Status Date Plugged & Comment <br /> Abandoned <br /> Test mine well continued as production well in commercial <br /> 20-14 Plugged & 7/9/04 phase. Well pad and road contoured and reseeded. <br /> Abandoned Approximately 0.5 acres reclaimed in 2005. Two lane track <br /> remains for access to 21-4 ground water monitoring well. <br /> 20-19 Plugged & 10/8/2016 SS Well plugged and abandoned. Well pad and road reclaimed. <br /> Abandoned 12/17/08 LS 0.49 acres in 2015. <br /> 20-30 Plugged & 9/7/04 Well pad and road contoured and reseeded. Approximately <br /> Abandoned 0.21 acres reclaimed in 2014. <br /> 20-31 Plugged & 9/7/04 Well pad and road contoured and reseeded. Approximately <br /> Abandoned 0.42 acres reclaimed in 2014. <br /> 20-32 Plugged & 9/6/04 Well pad and road contoured and reseeded. Approximately <br /> Abandoned 0.46 acres reclaimed in 2014. <br /> 20-33 Plugged & 9/2/04 10/24/14 Well plugged and abandoned. Well pad and road reclaimed <br /> Abandoned 0.39 acres in 2015. <br /> 20-35 Plugged & 9/9/04 Well pad and road contoured and reseeded. Approximately <br /> Abandoned 0.48 acres reclaimed in 2014. <br /> Plugged & Well plugged and abandoned. Well pad and road reclaimed. <br /> 20-36 Abandoned 10/15/2015 —0.14 acres in 2015. <br /> Plugged & Well plugged and abandoned. Well pad and road reclaimed. <br /> 20-74 Abandoned 9/29/2015 <br /> 0.74 acres in 2015. <br /> 20-76 Plugged & 9/6/04 Well pad and road contoured and reseeded. Approximately <br /> Abandoned —0.55 acres in 2015. <br /> Alluvial monitoring well. Installed during test mine phase to <br /> monitor down gradient of test mine ponds. Road is access <br /> Ground Water Well plugged to test mine pad from bottom. Road still in use. Same pad <br /> 21-2 and abandoned as 21-3 well. Interim reclamation on top soil pile only <br /> monitoring well 2016 approximately 0.02 acres in 2000. Vegetation and storm <br /> water management ongoing. Planned for reclamation <br /> 2016. <br /> Multiple completion monitoring well (4 zones). Road still in <br /> use. Same pad as 21-2 well. Interim reclamation on top soil <br /> 21-3 and abandoned <br /> Ground Water Well plugged pile only approximately 0.02 acres in 2000 recorded with 21- <br /> monitoring well 2016 2 above. Vegetation and storm water management <br /> ongoing. Planned for reclamation 2016. <br /> Nested wells(4 zones). Well pad and road still open. Road <br /> Ground Water Plugged and is two lane track. Area reclaimed along with 20-14 <br /> 21-4 monitoring well abandoned 2016 production well pad. Vegetation and storm water <br /> management ongoing. Planned for reclamation 2016. <br /> Alluvial monitoring well. Road still in use. Road is two lane <br /> Ground Water Plugged and track used by rancher for irrigation. Vegetation and storm <br /> 21-5 monitoring well abandoned 2016 water management ongoing. Planned for reclamation <br /> 2016. <br /> 21-15 Plugged& 6/18/04 Well pad and road contoured and reseeded. Approximately <br /> Abandoned 0.6 acres reclaimed in 2005 <br /> 21-16 Plugged & 9/8/04 Well pad and road contoured and reseeded. Approximately <br /> Abandoned 0.5 acres reclaimed in 2005 <br /> Solvay Chemicals, Inc.. 29 <br /> DRMS Annual Report <br /> July 8, 2016 <br />