Laserfiche WebLink
In Photo 19 on this page, you can see production well 20-19 after reclamation in 2015. The <br /> short lateral road to this well was also backfilled and drill seeded. <br /> PIN <br /> `HIAe vYi t w �. 3 <br /> 4_ I� -TN <br /> lKS <br /> A . y <br /> 40 <br /> „ a <br /> 4 <br /> yx <br /> tv <br /> Photo 19— Well 20-19 after reclamation. The power lines have been removed and the orange equipment for <br /> removing the main well field pipe is on the road. This photo is from early June 2016. <br /> The lateral pipe connecting to this well extended along a one lane road above the well pad that <br /> was used during the operation of the Test Mine from 1987 to 1999. The road provided access <br /> to a ground water monitoring well for the A groove, well 29-3 that is up on the top of this <br /> ridge. This narrow road will also be reclaimed as the 29-3 ground water monitoring well <br /> location is reclaimed in fall 2016. <br /> Solvay Chemicals, Inc.. 20 <br /> DRMS Annual Report <br /> July 8, 2016 <br />