Laserfiche WebLink
Photo 14 included below shows production well 29-27 before the well was plugged and <br /> abandoned. This location is out on a south facing point about mid-way in the 0-5 year mining <br /> panel. Considerable cast over material surrounds the leveled well pad and the slopes are very <br /> steep extending a few hundred feet deep into the canyon below. <br /> The lateral road and piping extending out to this well from the main well field road is very long. <br /> It was approximately 0.4 acres that were also reclaimed and drill seeded. <br /> ,` s r <br /> #A `."#aI :,, y f L sa / ..p �`•. <br /> Ile <br /> t RV <br /> f 3a�r a ate* 7" <br /> > 7 jA <br /> r <br /> 1. <br /> c <br /> well 29-27 shown before the well was plugged and abandoned in 2015. Note the very <br /> Photo 14 — Production e f P 99 <br /> rocky steep slopes where the cast over material was removed to level out the ridge during construction. This <br /> photo was taken using a drone in June 2015. <br /> Solvay Chemicals, Inc.. 15 <br /> DRMS Annual Report <br /> July 8,2016 <br />