Laserfiche WebLink
The following photo shows well pad 20-33 following reclamation in 2015. Photo 9 looks across <br /> Yankee Gulch to the north from above and beside well pad 20-33. Two other production well <br /> pads and one monitoring well pad can also be seen in this view. Note also that the main well <br /> filed pipeline has been removed in this area by June 2016. <br /> ..2•w• +y`.,`-,« ^*• ,w.« '^a;4^'� r4, �V ,1;.++A r �`�".n�."rc1,..,. r ., , <br /> Production Well 20-74 <br /> • ' �'�t.�' Reclaimed 2015 ` �� " � <br /> . . ,.',, + a Production Well 20 31 <br /> ¢ _ .«� �� , *y } '�`#•� 10 Reclaimed 2014 <br /> i lit <br /> • <br /> 4� <br /> t" <br /> .r <br /> yyi <br /> 1 <br /> Ground Water Monitoring <br /> Well Pad (20-4A and 20-46) p <br /> r <br /> Production Well 20-33 <br /> Reclaimed 2015 <br /> Photo 9 — Production Well 20-33 following reclamation in 2015. The main well field pipe has been removed. <br /> From this vantage point you can also see the reclaimed well pads for production wells 20-74 and 20-31 and on <br /> the left the still open pad for groundwater monitoring well 20-4A and 20-48 are visible. Photo June 2016 <br /> The ground water monitoring well pad for wells 20-4A and 20-413 will be re-contoured and <br /> reclaimed in fall 2016. Work is ongoing to complete the plugging and abandonment of all of <br /> the ground water monitoring wells. <br /> Solvay Chemicals, Inc.. 10 <br /> DRMS Annual Report <br /> July 8,2016 <br />