Laserfiche WebLink
In the next photo (Photo 6) production well 20-74 is again visible. Below production well 20-74 <br /> is the pad for 20-31 and at the top of this lateral leg just off the main well field road is <br /> production well 20-30. Both of these production wells and the lateral roads to access them <br /> were reclaimed in 2014. <br /> Production Well Pad 20-74 with Well Skid <br /> and piping still present. <br /> Production Well Pad 20-30 <br /> reclaimed in 2014 <br /> I <br /> e <br /> Production Well Pad 20-31 <br /> reclaimed in 2014. „: * <br /> s <br /> w <br /> �w k <br /> 14 <br /> _ y <br /> A <br /> s <br /> < x <br /> c <br /> Photo 6—Production well 20-74 to the right in the photo. The well skid and piping are still in place in mid 2015. <br /> Below well 20-74 is the reclaimed pad for production well 20-31. Just off of the main well field road is the <br /> reclaimed pad for production well 20-30. Production well 20-31 and 20-30 were both reclaimed in 2014. All <br /> three of these production wells were accessed by one lateral road and pipe. This photo shows the steep terrain <br /> of these locations and the surrounding vegetation. Photo June 2015 <br /> Solvay Chemicals, Inc.. 7 <br /> DRMS Annual Report <br /> July 8,2016 <br />