My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-12_REVISION - M1985112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985112
>
2016-07-12_REVISION - M1985112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:12 PM
Creation date
7/13/2016 10:31:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985112
IBM Index Class Name
Revision
Doc Date
7/12/2016
Doc Name
Incompleteness Notice
From
DRMS
To
Loloff Construction, Inc.
Type & Sequence
TR2
Email Name
PSH
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7/08/2016 <br /> Division of Reclamation, Mining and Safety <br /> Attn: Peter Hays <br /> 1313 Sherman Street <br /> Room 215 <br /> Denver, CO 80203 <br /> RE: Loloff Construction, Inc. -Loloff Pit—Technical Revision No. 2 Request <br /> File No. M-1985-112. <br /> Dear Mr. Hays: <br /> Loloff Construction, Inc. requests a revision to their existing permit to address the approval of the <br /> installation of a slurry wall at the Loloff Pit. The following items have been submitted for your review <br /> and/or comment: <br /> 1. Proposed Slurry Wall Alignment: A proposed slurry wall alignment with bore locations and a <br /> profile of the wall design has been submitted for your review and comment. <br /> 2. Proposed Earthworks Specifications: A proposed design and construction specification for the <br /> earthworks have been submitted for your review and approval. <br /> 3. Proposed Slurry Wall Specifications: A proposed design and construction specification for the <br /> slurry wall have been submitted for your review and approval <br /> 4. Revised Reclamation Plan: A revised Reclamation Plan has been submitted for your review and <br /> approval. All final reclaimed slopes are 3H:1V. <br /> The final design of the slurry wall is completed pending any comments or concerns from your office. <br /> Loloff Construction, Inc. appreciates your consideration of this request and looks forward to your <br /> response. <br /> Thanks in advance for your assistance, and feel free to contact me at 970-217-9965 or email me with <br /> comments or concerns. <br /> a <br /> Best Regards, <br /> ,77 <br /> �J <br /> John S.Vazquez, P. <br /> Attachments: <br /> Slurry Wall Design Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.