Laserfiche WebLink
n <br />Colorado Division of Reclamation, Mining and Safety <br />July 8, 2016 <br />Page 2 <br />language has been insert to clarify that station 0+00 to 4+88 (north of the West Haul <br />Road) does have a design that is included in Appendix 2.05.3(4)-1. <br />Included in this package are revised materials in response to your adequacy comments and a <br />change sheet index to assist with incorporating the revised materials into the permit document. If <br />you have any questions regarding the enclosed adequacy review responses, please contact Tony <br />Tennyson at 970-824-1232 or ttepnyson@tristate,t.org. <br />Sincerely, <br />Daniel J. Casiraro <br />Senior Manager <br />Environmental Services <br />DJC:TT:dbr <br />Enclosures <br />cc: Dan Casiraro (via email) <br />Chris Gilbreath (via email) <br />Frank Ferris (via email) <br />Jason Storey (via email) <br />Tony Tennyson (via email) <br />File: G474 -11.3(21)c-4 <br />AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER <br />A Touchstone Energy'Cooperative <br />