My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2020 10:52:39 PM
Creation date
7/12/2016 8:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2016
Doc Name
TR78 Corrected
From
Newmont
To
DRMS
Type & Sequence
TR78
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02776-O.DOCX ■ <br /> Squaw Gulch VLF <br /> Project No.475.0106.006 <br /> April 08,2016 <br /> anchor trench as shown in the DRAWINGS. The geomembrane shall be seamed along <br /> the entire distance of the anchor trench to the termination of the geomembrane <br /> sheet. <br /> 3.4. Protection <br /> CONTRACTOR shall be responsible for the following: <br /> A. Do not use equipment or tools, which damage the geomembrane by handling, <br /> trafficking, excessive heat, leakage of hydrocarbons, or other means. <br /> B. Ensure prepared surface underlying geomembrane has not deteriorated since <br /> previous acceptance, and remains acceptable until acceptance by CC&V, as detailed in <br /> Section 3.02. <br /> C. Keep geotextile elements immediately underlying the geomembrane clean and free of <br /> debris. <br /> D. Do not permit personnel to smoke or wear damaging shoes while working on <br /> geomembrane. <br /> E. Unroll panels in a manner, which prevents scratches or crimps in geomembrane and <br /> does not damage supporting Soil Liner Fill. <br /> F. Place panels in a manner that prevents wrinkles (especially differential wrinkles <br /> between adjacent panels). <br /> G. Prevent wind uplift and damage to geomembrane subgrade by providing temporary <br /> and permanent loading and/or anchoring that will not damage geomembrane. <br /> H. Minimize direct contact of equipment and personnel with geomembrane. <br /> I. Protect geomembrane in areas where excessive traffic is expected with geotextiles, <br /> extra geomembrane, or other materials acceptable to MANAGER, DESIGN ENGINEER, <br /> and CERTIFYING ENGINEER. <br /> 3.5. Field Panel Deployment <br /> A. CONTRACTOR shall install field panels at locations indicated on CONTRACTOR's layout <br /> plan, as approved by MANAGER, DESIGN ENGINEER, and CERTIFYING ENGINEER. <br /> B. CONTRACTOR shall replace damaged (i.e., torn, twisted, or crimped) field panels, or <br /> portions thereof, at no cost to CC&V. CONTRACTOR shall repair less serious damage <br /> according to Article 3.10 of this Section, at no cost to CC&V. CERTIFYING ENGINEER <br /> shall determine if material is to be repaired or replaced. <br /> C. CONTRACTOR shall remove damaged panels, portions of damaged panels, and other <br /> geomembrane scrap. <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.