Laserfiche WebLink
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02711.DOCX . <br /> Squaw Gulch VLF <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> 2.2. Installation <br /> A. Install according to manufacturer's recommendations. <br /> B. Pipe shall be unloaded and handled with reasonable care to preventdamage. <br /> C. Circumferential seams shall be installed with their inside circumferential sheet laps <br /> pointing downstream. <br /> D. The completed trench bottom shall be firm for its full length and width or as approved <br /> by CERTIFYING ENGINEER. <br /> 2.3. Field Connections <br /> A. All connections for CSP shall be corrugated bands or other equally effective types of <br /> field joints as approved by the CERTIFYING ENGINEER. <br /> 2.4. Bedding And Backfill <br /> A. Backfill and compact Pipe Bedding Material in accordance with Section02200.0. <br /> 2.5. Thrust Blocks <br /> Thrust blocks shall be lean concrete without reinforcement placed as shown on the DRAWINGS. <br /> Page 2 <br />