My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2020 10:52:39 PM
Creation date
7/12/2016 8:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2016
Doc Name
TR78 Corrected
From
Newmont
To
DRMS
Type & Sequence
TR78
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02210.DOCx <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> 3.3. Native Material <br /> For the remediation of shafts greater than 25 feet, which are currently backfilled with native <br /> material, CONTRACTOR shall excavate the current native backfill to a depth of 25 feet <br /> below Soil Liner Fill subgrade elevation. The surface of the native material at this elevation will <br /> then be compacted using a method specification that results in a firm surface that will be <br /> approved by CERTIFYING ENGINEER. CONTRACTOR shall then remediate the underground <br /> working using Coarse Shaft Backfill, Cement Plug, and Cemented Rockfill as shown on the <br /> DRAWINGS. <br /> 3.4. Blasting <br /> The CONTRACTOR shall compact the surface of the area that has been blasted. If the blasted <br /> surface is below the Soil Liner subgrade elevation, the CONTRACTOR shall compact the blasted <br /> surface using a method specification approved by the CERTIFYING ENGINEER, and then <br /> remediate according to the DRAWINGS to achieve the design grades and elevations. If the <br /> blasted surface is above the Soil Liner subgrade elevation, the CERTIFYING ENGINEER assess <br /> the foundation conditions and recommend whether the CONTRACTOR shall over excavate and <br /> backfill with Cemented Rockfill and Structural Fill, or if the CONTRACTOR shall remove excess <br /> material and compact the final grade surface using a method specification approved by the <br /> CERTIFYING ENGINEER. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.