Laserfiche WebLink
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02200.DOCX ■ <br /> Squaw Gulch VLF <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> Work does not meet the requirements of the SPECIFICATIONS, MANAGER and <br /> CERTIFYING ENGINEER will establish the extent of the nonconforming area. The <br /> nonconforming area shall be reworked by CONTRACTOR until acceptable test <br /> results are obtained at no additional.cost to CC&V <br /> 9. Prior to any geosynthetics being placed on Bedding Fill, the area will be tested by <br /> CQA Monitor. No geosynthetics will be allowed to be placed on frozen material, as <br /> defined in Section 3.06, without the area in question being retested by the CQA <br /> Monitor. <br /> 3.7. Equipment <br /> CONTRACTOR may use any type of earthmoving or excavating equipment unless otherwise <br /> noted in the SPECIFICATIONS, provided the equipment is in a satisfactory condition, complies <br /> with applicable rules and regulations, is of such capacity that the construction schedule can be <br /> maintained as planned by CONTRACTOR, and is approved by MANAGER. <br /> Page 21 <br />