My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2020 10:52:39 PM
Creation date
7/12/2016 8:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2016
Doc Name
TR78 Corrected
From
Newmont
To
DRMS
Type & Sequence
TR78
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine h . <br /> Technical Specification No.02200.00CX ■ <br /> Squaw Gulch VLF <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> minimum of 120 inches for CAT 777 (or equivalent) of Low Volume Solution <br /> Collection Fill placed over the geomembrane and solution collection piping. <br /> 7. When placing Low Volume Solution Collection Fill the maximum acceptable drop <br /> height is 3 feet. <br /> 8. CONTRACTOR shall operate equipment in a manner that is protective of underlying <br /> geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the occurrence of <br /> any damage to the underlying geosynthetics, MANAGER will instruct CONTRACTOR <br /> to remove Low Volume Solution Collection Fill to expose the geosynthetics. <br /> CONTRACTOR shall uncover, repair any observed damage of the underlying <br /> geosynthetics, in accordance with the repair requirements of Sections 02776.0 and <br /> 02777.0 of these SPECIFICATIONS, and recover, at no cost to CC&V. <br /> 9. CONTRACTOR shall place Low Volume Solution Collection Fill at a rate such that no <br /> single area of 350,000 square feet of geomembrane liner is exposed to ultraviolet <br /> light for more than 180 days. <br /> 10.CONTRACTOR shall provide close continuous monitoring at the point of placement <br /> during the placement of the Low Volume Solution Collection Fill over geosynthetics. <br /> 11. CONTRACTOR shall verify the final thickness of Low Volume Solution Collection Fill <br /> to determine compliance with this SPECIFICATION. CONTRACTOR shall record <br /> verification location, elevation, and thickness. CQA Monitor shall witness all <br /> verification measurements. CONTRACTOR will submit a method of verifying Low <br /> Volume Solution Collection Fill depth to MANAGER for approval. Grade markers <br /> shall be placed on a 50- by-50-foot grid with additional points required for breaks in <br /> grade. CONTRACTOR shall remove all grade markers under supervision of CQA <br /> Monitor after verification measurements have been approved by MANAGER and <br /> CERTIFYING ENGINEER and will backfill holes with Low Volume Solution Collection <br /> Fill. Areas with deficient thickness shall be reworked by CONTRACTOR, until <br /> acceptable measurements are obtained. If MANAGER or CERTIFYING ENGINEER <br /> suspects the occurrence of any damage to the underlying geosynthetics, MANAGER <br /> will instruct CONTRACTOR to remove Low Volume Solution Collection Fill to expose <br /> the geosynthetics. CONTRACTOR shall uncover, repair any observed damage of the <br /> underlying geosynthetics, in accordance with the repair requirements of Sections <br /> 02776.0 and 02777.0 of these SPECIFICATIONS and recover, at no cost to CC&V. <br /> 12. CONTRACTOR will provide adequate illumination as approved by MANAGER, if Low <br /> Volume Solution Collection Fill placement is carried out at night. A minimum of 2- <br /> foot candles measured at the synthetic liner, shall be used when Low Volume <br /> Solution Collection Fill placement is carried out at night. <br /> G. Soil Liner Fill <br /> 1. Soil Liner Fill shall be placed within the limits of the valley leach facility as shown on <br /> the DRAWINGS and shall begin only after completion of all, or MANAGER and <br /> Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.