My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2020 10:52:39 PM
Creation date
7/12/2016 8:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2016
Doc Name
TR78 Corrected
From
Newmont
To
DRMS
Type & Sequence
TR78
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02200.DOCX <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> D. CONTRACTOR shall grade topsoil stockpiles to prevent erosion and ponding of <br /> precipitation in the stockpile areas. The maximum topsoil stockpile height will be <br /> approved by MANAGER. The CONTRACTOR shall protect stockpiled topsoil by an <br /> effective cover of non-noxious, quick- growing, annual, and perennial plants, approved <br /> by MANAGER, which shall be seeded or planted during the first appropriate growing <br /> season after removal. <br /> 3.3.Waste Removal <br /> Waste material is defined as material too wet, too dry, frozen or containing ice or snow, <br /> containing organic or other deleterious matter, having poor characteristics of grading or <br /> compaction, having other characteristics that may result in undesirable settlement or other <br /> movement of the fill, or within the fill, or otherwise not meeting the requirements of the <br /> SPECIFICATIONS, provided that this definition permits drying, water, and any other processing <br /> or reprocessing to make the material stable and suitable prior to incorporating it into the fill as <br /> permitted in the SPECIFICATIONS or by the MANAGER and CERTIFYING ENGINEER. <br /> A. CONTRACTOR shall excavate and remove waste in a manner that will minimize <br /> contamination with other soil horizons. <br /> B. CONTRACTOR shall stockpile removed waste at locations designated by MANAGER <br /> 3.4. Excavation <br /> A. CONTRACTOR shall perform excavation to the lines and grades shown on the <br /> DRAWINGS or as directed by MANAGER. No excavation shall begin until the <br /> CONTRACTOR has provided construction staking for the proposed work. <br /> B. CONTRACTOR shall prevent the disturbance of surrounding areas during excavation. <br /> Where selective excavations are required to obtain materials for Structural Fill and <br /> Select Structural Fill, the material removed from the excavations shall be taken directly <br /> to the fill areas or, if required, stockpiled by material types. The stockpiles shall be <br /> approved by MANAGER. <br /> C. CONTRACTOR shall grade all excavations to ensure grades are maintained to provide <br /> adequate drainage at all times. Work shall be suspended by CONTRACTOR when, in the <br /> opinion of MANAGER and CERTIFYING ENGINEER, the site is overly wet, muddy, or <br /> otherwise unsuitable for proper maintenance, until directed otherwise by MANAGER, <br /> at no cost to CC&V. <br /> D. In excavations where Structural Fill or Select Structural Fill is to be placed on slopes <br /> steeper than 3H:1V, horizontal benches shall be excavated into the slope to allow fill to <br /> be placed in horizontal lifts. The CONTRACTOR shall continuously bench and key <br /> embankment material into the existing material a minimum of 2 feet. <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.