My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2020 10:52:39 PM
Creation date
7/12/2016 8:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2016
Doc Name
TR78 Corrected
From
Newmont
To
DRMS
Type & Sequence
TR78
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine I <br /> Technical Specification No.0140G-2.DOCX . <br /> Squaw Gulch VLF <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> 7.1. Daily Record Keeping <br /> The CQA Monitor shall keep daily records consisting of field notes, observation and testing <br /> data sheets, summary of the daily meeting with the INSTALLER or CONTRACTOR, and reporting <br /> of construction problems and resolutions. This information shall be submitted on a regular <br /> basis to the MANAGER for review. <br /> 7.2. Geosynthetic Observation and Testing Forms <br /> The CQA Monitor shall document geosynthetic observations and test results on forms which <br /> include the following information: <br /> ■ date, project name, location, and weather data; <br /> ■ identification of panel or seam numbers; <br /> ■ description of ongoing construction, detailing deployment areas; <br /> ■ numbering system identifying test or sample number; <br /> ■ location and identification of repairs and date of repair; <br /> ■ length and/or thickness measurements for geomembrane panels or seams; <br /> ■ welding machine temperatures and settings; welding machine and technician <br /> identifications; <br /> ■ location of tests and test results; <br /> ■ identification of testing technicians and time of tests; and <br /> ■ signature or initials of the CQA Monitor. <br /> 7.3. Photo Documentation <br /> The CQA Monitor shall photograph all phases of construction. <br /> 7.4. Design And Specification Changes <br /> During construction, the need to address design and SPECIFICATION changes, modifications, or <br /> clarifications may arise. In such cases the CQA Monitor shall notify the MANAGER, which will <br /> notify the DESIGN ENGINEER and CERTIFYING ENGINEER. Design and SPECIFICATION changes <br /> shall only be made with written agreement from the MANAGER and DESIGN ENGINEER. <br /> 7.5. Weekly Progress Reports <br /> The CQA Monitor shall prepare weekly progress reports summarizing all construction and CQA <br /> activities. This report shall be submitted to the MANAGER and shall include the following <br /> information: <br /> Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.