Laserfiche WebLink
6 (FORM 2 - Publie filing) <br />9. Describe the estimated topsoil depth and how topsoil will be saivaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution denth <br />No topsoil exists in the area of anticipated disturbance other than that contained within <br />the , acial til. <br />9. Describe how drill holes wi l be plugged (reter to Rule. 5 4 of the Rules for required abandonment procedure. -i <br />A single drill hole @360 feet will be conducted during this permitted time on the <br />Santiago #1 on private property. The drill hole is designed to sample the lower 7t' Level <br />@the 5h Level wenze. The drill hole will be collared and left in place for emergency use <br />for future mining activity at this level. No voids will be encumbered. <br />All cutting will be absorbed into talus and aU core samples will be removed from the site. <br />10. Describe how portals, adits, shafts_ ponds, excavations: or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards) You may wish to contact the Division for closure specifications <br />No adits will be opened under this NOI. <br />11. Describe how roads will be reclaimed or returned to their pre -prospecting (or better) condition <br />All roads are passable for transportation and equipment See photos -Exhibits D & E <br />lnless sloughing of road banks or wash outs occur. no reclamation should be -nee ed_ <br />