Laserfiche WebLink
July 5, 2016 C-1983-059/Terror Creek Loadout JDM <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />N - Air Resource Protection <br />N - Availability of Records <br />NA - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />NA - Explosives <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />Y - Gen. Compliance With Mine Plan <br />NA - Other <br />NA - Processing Waste <br />Y - Roads <br />Y - Reclamation Success <br />N - Revegetation <br />NA - Subsidence <br />NA - Slides and Other Damage <br />R - Support Facilities On-site <br />Y - Signs and Markers <br />NA - Support Facilities Not On-site <br />NA - Special Categories Of Mining <br />N -Topsoil <br />COMMENTS <br />This was a partial coal inspection of the Terror Creek Loadout conducted by Jason Musick of the Division of <br />Reclamation, Mining and Safety. The weather was clear and the site was dry during the on -the -ground inspection <br />of the site. No activities were on-going during the inspection. The majority of the structures at the site have been <br />demolished and the site is currently inactive and in reclamation. <br />HYDROLOGIC BALANCE - Rule 4.05 Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, <br />4.05.6; Discharge Structures 4.05.7, 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br />Monitoring 4.05.13; Surface Water Monitoring 4.05.13; Drainage — Acid and Toxic Materials 4.05.8; <br />Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />The sediment pond was dry with no evidence of recent discharge and the valve of the primary discharge pipe was <br />closed. The dug -out pond was dry with no discharge at the time of the inspection. Embankments were well <br />vegetated and stable with no evidence of erosion and no issues noted. <br />SUPPORT FACILITIES - Rule 4.04: <br />Facilities remaining on-site are the concrete pad from the shop and the office. A portion of the crushing and <br />screening plant and the truck scale and scale house remain on site. Footers and wing walls remain. <br />The site is stable with no issues noted at the time of the inspection. <br />DOCUMENTS RECEIVED - None <br />OTHER (SPECIFY) - NA <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 2 of 3 <br />