Laserfiche WebLink
June 21, 2016 C-1981-035/King Coal Mine RAR <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 7 of 12 <br /> <br /> <br /> <br />Photo 5A: May 2016, culvert <br />C20 <br /> <br /> <br /> <br />Photo 5B: June 2016, Temporary culvert installation in preparation <br />for new fan location. <br /> <br /> <br /> Photo 6: Flow to the containment needs to be <br />maintained. Maintenance item C. <br /> <br /> Photo 7A: Material at King II septic absorption <br />field (May 2016). <br /> <br /> Photo 7B: Material at King II septic absorption <br />field (June 2016), appears to have been leveled <br />since May 2016 inspection.