Laserfiche WebLink
Rocky Mountain Materials&Asphalt, Inc <br /> Red Canyon Quarry <br /> Blasting Plan <br /> The onsite Foreman will follow the following plan when blasting is to be initiated at Rocky Mountain <br /> Materials' Red Canyon Quarry site. <br /> 1. Blasting Schedule. <br /> • Notification to Blasting Company <br /> • Scheduled Blast Date:,1 ag- r/ 0701� <br /> Time:Sor a?;V1 <br /> 2. Notification of Outside Agencies. ( Minimum 72 hrs. prior to blast event). <br /> • Colorado Division Of Reclamation, Mining & Safety <br /> Tim Cazier 303-866-3567 Ext. 8169 <br /> • Ken Bishop (Adjoining Property Owner) <br /> Email: ken(@I<idlynx.com <br /> • Additional Notification <br /> A. A) <br /> B. N/�9 <br /> 3. Ground Control. Radio communication will be maintained at all times between the site foreman <br /> and the lead blaster. <br /> • Safety Brie ing with Blasting Crew <br /> Date: G Time: <br /> Forman: , ,S�4r--, Blaster: �-�— <br /> • Access to Blast area closed <br /> Time: 7. `lc, BY: <br /> • Mine site cleared and access close <br /> Time: BY: <br /> • Blast Initiation <br /> Time: .GCS By: <br /> • Blast Area Cleared <br /> Time: O By: <br /> 4. Blast Report:The blast report will be completed by the Certified blaster in charge of the event <br /> and will include, at minimum, the following infprmation. <br /> A. Mine Site <br /> Date OLIO <br /> Time 9:04 <br /> Location of Blast:To include GPS coordinates of the initiation point <br /> Igoi; a� l�U�7S,' 6776' s L&) - 104. - <br />