Laserfiche WebLink
C. Project Description. Describe all aspects of the operation including mining, milling. and exploration methods. materials, <br /> equipment. workforce, construction and operation schedule, power requirements, how clearing will be accomplished, topsoil <br /> stockpO, We rock placement, tailings disposal, proposed number of drillholes and depth. depth of proposed suction <br /> dredging, and how gravels will be replaced. etc. Calculate production rates of ore. Include justification and calculations for <br /> settling pond capacities, and the size of runoff diversion channels <br /> Exploration and mining will occur for 180 days or less per season using mechanized equipment and hand tools. <br /> Clearing, if necessary will be accomplished with chainsaws or backhoe/excavator. (Much of the area within the <br /> two one acre proposed dig sites is bare or has dead timber from the Hayman Fire.)Backhoe/excavator will be <br /> used to expose pegmatite structures which will then be excavated with hand tools. Topsoil will be stockpiled for <br /> later reclamation. Waste rock, tailings and slash will be stockpiled until seasonal (or final)reclamation and used <br /> to backfill open pits or trenches. <br /> D. Equipment and Vehicles. Describe that which is proposed for use in your operation(Examples drill,dozer, wash plant,mill,etc.) Include <br /> sizes,capacity.frequency of use.etc <br /> Personal vehicles will be used to access the one acre mining sites. Excavation equipment will consist of a <br /> Case 580M loader backhoe or a 25 ton excavator. Backhoe or trackhoe will be used for initial clearing and to <br /> cut pits and trenches to expose pegmatite minerals. Mineral pockets will be excavated using hand tools. After <br /> open pits/trenches are exhausted (or for seasonal reclamation,)backhoe/trackhoe will be used to backfill <br /> excavations. Equipment will be used for 180 days or less per mining season. <br /> E. Structures. include information about fixed or portable structures or facilities planned for the operation. Show locations on the <br /> map. Include such things as living quarters. storage sheds.mill buildings, thickener tanks, fuel storage.powder magazines. <br /> pipelines, water diversions.trailers,sanitation facilities including sewage disposal,etc, include engineering design and geotechnical <br /> information for project facilities,justification and calculations for sizing of tanks,pipelines and water diversions.etc. <br /> No fixed structures will be constructed at one acre dig sites. Portable structures will include a backcountry <br /> portable toilet and a portable canopy for sun/rain protection near dig site. Portable structures will remain on <br /> site for 180 days or less per season. Refuse bags from backcountry toilet will be disposed of off site. <br /> V, ENVIRONMENTAL PROTECTION MEASURES(SEE 36 CFR 228,8) <br /> A. Air Quality. Describe measures proposed to minimize impacts on air quality such as obtaining a burning permit for slash disposal <br /> or dust abatement on roads <br /> Air quality is not predicted to be an issue at either site, if dry conditions or winds create blowing dust, slash <br /> or shredded slash will be used for dust abatement on exposed soils. Any tailings piles remaining after <br /> seasonal reclamation will be seeded with approved native seed mix to prevent erosion or blowing dust. <br /> (If more yvice is needed to fell out a both of information,use additional sheets and attach form) <br /> -3- <br />