Laserfiche WebLink
DEMOLITION WORK <br /> Task description: Structure Demolition/Refuse Removal <br /> Site: Bates-Hunter Mine Permit Action: 2016 Bond Calculation Permit/Job#: M1990041 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado _ Abbreviation: None _ <br /> Date: 6/23/2016 County: Gamin Filename: M041-001 <br /> User: MAC <br /> Agency or organization name: DRMS <br /> UNIT COSTS Location adiustment: 101.20% <br /> Structure or Item Demolition Menu <br /> Description TDimensions I Selection Quantity Unit Unit Total Cost <br /> Cost <br /> Mill Building 90'x 37'x 20' Plant(1C)demo./off-site 66,600.00 CF 1 $1.22 $81,518.40 <br /> disposal in approved <br /> landfill-Max. 30 mile <br /> haul —_ <br /> Mill Foundation 190'x 37' Demo. and on-site 3,330.00 SF $1.11 $3,679.65 <br /> disposal in excavated pit, <br /> 6 in. thick-Max. 50 ft. <br /> push <br /> Load scrap and refuse 33 truckloads Means 02 41 19.19 3080 264.00 i CY $17.35 $4,580.40 <br /> (Mill and Mine) <br /> Haul 8 CY truck with r 30 miles one Means 02 41 19.19 5100 990.00 Mile $0.66 $653.40 <br /> Means Crew B-34B I way 1 <br /> Scrap and Refuse 264 CY Dump fees-Rubbish 264.00 CY I $63.00 $16,632.00 <br /> Dump Fees only <br /> Total Cost <br /> Subtotal (adjusted for <br /> Job Hours: 0.00 (unadjusted): $107,063.85 location): $108,348.62 <br />