My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-05_REVISION - M2009023
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009023
>
2016-07-05_REVISION - M2009023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:12:40 PM
Creation date
7/7/2016 11:17:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009023
IBM Index Class Name
Revision
Doc Date
7/5/2016
Doc Name
Incompleteness Notice
From
DRMS
To
The Greer Family
Type & Sequence
SO1
Email Name
LJW
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tr U! <br /> Permanent Man-made Structures a 0001-�a3 <br /> Two permanent man-made structures exist within 200' of the proposed affected area. <br /> One is a barbed wire fence (actually two fences) that runs along the south and southeast <br /> sides of the operation (owned by Pat and Lila Greer). The other is the Shell Pipeline to <br /> the east of the operation. See Exhibit E for locations of these features. <br /> The southern edges of the settling pond and pit come within about 15' of the barbed wire <br /> fence. There will be 1:1 slope on the pit edge during mining operations (3:1 slope after <br /> reclamation is complete). The La Plata River runs within a few feet of the fence on the <br /> fence's south side immediately at the bottom of a 1:1 slope(approximately). The fence is <br /> about 15 feet further from top of the pit bank than is the fence from the top of river bank. <br /> The river has not had any effect on the integrity of the fence to date. Therefore, it is not <br /> anticipated that the mining operation will have any effect on the fence. If any damage <br /> does occur to the fence as a result of mining activities,per Nielsons' lease agreement <br /> with the Greers, it will be repaired upon completion of mining activities at the site. <br /> Road improvement activities (widening towards the west and grading) will take place <br /> within about 30' of the Shell Pipeline(buried)on the eastern end of the operation. The <br /> Redmesa Pit itself is approximately 1300' from the Shell Pipeline. The proposed mining <br /> activity will have no effect on the Shell Pipeline. <br />
The URL can be used to link to this page
Your browser does not support the video tag.