My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-06_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-07-06_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:24:35 PM
Creation date
7/6/2016 4:17:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/6/2016
Doc Name
Incompleteness Notice
From
DRMS
To
CC&V
Type & Sequence
TR78
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor | Robert Randall, Executive Director | Virginia Brannon, Director <br />July 6, 2016 <br />Mr. Jack Henris <br />Cripple Creek & Victor Gold Mining Company <br />100 N. Third Street <br />P.O. Box 191 <br />Victor, CO 80860 <br />Re: Project, Permit No. M-1980-244; <br />Incomplete Technical Revision (TR-78) Request <br />Dear Mr. Henris: <br />On July 1, 2016 the Division of Reclamation, Mining and Safety (Division) received a request for a <br />Technical Revision. There were some notable discrepancies between the information provided on the <br />Division’s cover sheet and that stated in CC&V’s cover letter. The cover letter indicated the only <br />proposed revision to the permit was for “Power and light installation at the grizzly/conveyor system”; <br />whereas the cover letter indicated updated/revised specifications for the Squaw Gulch Valley Leach <br />Facility were to also be considered in this revision. The letter further indicated the revised <br />specifications were included with the submittal, but the Division did not receive the referenced <br />specifications. Finally, the cover letter identified the submittal as TR#79. The Division’s records <br />indicate this submittal will be TR-78. <br />On July 6, 2016, I contacted Tamara Baker (CC&V) to help clarify the intent of this TR request. Ms. <br />Baker indicated the intent was to include the updated specification changes. The Division requires <br />the following for this TR submittal to be considered complete for the purpose of filing: <br />1.A revised Division “Request for Technical Revision (TR) Cover Sheet” that includes both the <br />power and light installation, and the revised specifications in the description (Note: include a <br />note on the fee schedule at the bottom of the form that the fee was already submitted and attach <br />a copy of the receipt included with this letter); <br />2.Revised Newmont cover letter changing the TR # to 78 and stating the cover letter was revised <br />to transmit the updated specifications. <br />3.Please also include the two drawings (annotated satellite image and power diagram) previously <br />submitted. It would be helpful if these drawings were also numbered and labeled (e.g., <br />Drawing 1. Location of buried powerline.)
The URL can be used to link to this page
Your browser does not support the video tag.