My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-01_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-07-01_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 10:31:03 PM
Creation date
7/5/2016 11:38:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
7/1/2016
Doc Name
Quality Assurance Monitoring/Test Results
From
Newmont
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation a <br /> Cripple Creek&Victor Gold Mine . <br /> Squaw Gulch VLF CQA <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,June 25,2016 <br /> 2.3 Anchor Trench <br /> Approximately 700 feet of interim anchor trench was excavated along the Phase 1 perimeter in <br /> accordance with design drawings and project technical specifications. <br /> Anchor trench backfill was performed using an excavator, a vibratory plate compactor and <br /> laborers. A NewFields representative monitored the backfill procedures to ensure that the <br /> anchor trench was constructed in accordance with the design drawings and project technical <br /> specifications. <br /> 2.4 Geomembrane Acceptance <br /> Panels P-1814 through P-1858 were accepted for Drain Cover Fill placement. The attached <br /> Figure 3 shows the acceptance areas. <br /> 3.0 STORM WATER MANAGEMENT <br /> Best Management Practices continued to be performed. <br /> 4.0 NEWFIELDS LABORATORY ACTIVITIES <br /> NewFields personnel performed sieve analysis, atterberg limits, compaction and permeability <br /> testing.The following samples were collected for laboratory testing: <br /> Drain Cover Fill: NFDCF-6-R (Phase 1 VLF) <br /> Leak Detection Fill: NFDCF-2-R (Phase 1 VLF) <br /> Soil Liner Fill: NFSLF-29-C and NFSLF-30-C (Dump 1 Processing Plant) <br /> Soil Liner Fill: NFSLF-28-R Phase 1 VLF) <br /> 5.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel attended the Weekly Contractor Planning Meeting (June 21, 2016), Ames <br /> daily safety meetings, Weekly Contractor Safety Meeting (June 23, 2016) and NewFields daily <br /> safety meetings. <br /> 6.0 MISCELLANEOUS, ISSUES AND CONCERNS <br /> Construction activities were paused at various times throughout the week due to <br /> thunderstorms in the area. <br /> The 793 haul truck berm along the VLF2 Haul Road was placed on approved DCF from <br /> approximately Station 47+00 to Station 52+00. <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.