Laserfiche WebLink
9►^ :' � ` <br /> Figure 2: Road reclamation during retreat of the excavator from project site.Fallen timber was replaced <br /> over the road.Vegetation disturbance from excavator tracks was minimal. <br /> The temporary access gate was removed as shown in Fig. 3. The original berm that <br /> blocks access was rebuilt and the original logs in front of it put back in place. <br /> Figure 3:Temporary access gate after installation(left)and conditions after removal and reclamation <br /> (right).Berm was rebuilt to original height and original logs put back in place. <br /> 4. Site Preparation and Seeding <br /> Following contouring and spreading and redistribution of the topsoil,the surface was left <br /> in rough conditions as the preferred method for seedbed preparation. Seeds were acquired <br /> in species type and ratio as stipulated and distributed as follows: <br /> Rocky Mountain Fescue (Festuca saximontana) 1-2 pounds/1000 sqft <br /> Slender Wheatgrass (Elymus trachycaulus) 4-8 ounces/1000 sqft <br /> Junegrass (Koeleria macrantha) 4-8 ounces/1000 sqft <br /> Fringed Sage (Artemisia frigida) 4-8 ounces/1000 sqft <br />