My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-01_REVISION - P2015007
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2015007
>
2016-07-01_REVISION - P2015007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 12:22:05 PM
Creation date
7/5/2016 11:37:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2015007
IBM Index Class Name
Revision
Doc Date
7/1/2016
Doc Name
Request for Surety Reduction
From
Tom Miller
To
DRMS
Type & Sequence
SL1
Email Name
MAC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Project Area Description <br /> The Silent Hill is a standard sized lode claim (CMC279645) 1,500 feet x 600 feet in <br /> dimension. It is located Buffalo Creek #1 task order (south of NFSR 550, east of Buffalo <br /> Creek CG, west of Morrison Creek). The Silent Hill claim and project area are indicated <br /> in Map 1. <br /> CP <br /> Silent Hill claim <� <br /> 4 <br /> o <br /> Access road <br /> S <br /> r� vemporary gate <br /> Map 1:Project area map,with Silent Hill claim,and project area indicated. Source:USGS Cheesman Lake <br /> Quadrangle,Colorado,7.5 minute. <br /> There were no life trees on the disturbed area. The ground consists of heavily weathered <br /> granite rock of the Pikes Peak batholith with oxidized bedrock (in part exposed in <br /> outcrop), saprolite, and weathered saprolite. Soil layer is thin and sparse, due to wildfire <br /> and associated local erosion. <br /> 2. Surface Disturbing Activities <br /> Work was performed by Tom Miller and Markus Raschke from 6/12/2015 to 6/26/2015 <br /> with an excavator CAS CX135 in the designated area as described in the approved POO, <br /> and shown in Map 1. The excavator was brought to site along route designed by FS using <br /> the abandoned sections of FS 541 and FS 542 as indicated. Fallen timber was removed <br /> and placed next to the track and placed back across the roadbed during reclamation. A <br /> temporary gate was installed off of FS 211 (Matukat Road) to control access, and <br /> removed, and reclaimed after project close out. <br />
The URL can be used to link to this page
Your browser does not support the video tag.