Laserfiche WebLink
EXHIBIT L-RECLAMATION COSTS <br /> Item Description Quantity Units Unit Cost Subtask Cost Total Cost <br /> 1.0 Mobilization/Demobilization 1 LS 10% Base Cost $813,795 <br /> 2.0 Project Safety Plan and Implementation 1 LS 2% Base Cost $244,138 <br /> 3.0 Erosion and Dust Control Plan and Implementation 1 LS 5%Total Cost $406,897 <br /> 4.0 Site Drainage and Runoff Control 3,500 LF $25 $87,500 <br /> 5.0 Debris Removal 25 LOADS $1,500 $37,500 <br /> 6.0 Earthwork $7,605,000 <br /> 6.1 Blasting and Excavation 364,700 CY $15 $5,470,500 <br /> 6.2 Backfill Placement and Compaction 364,700 CY $5 $1,823,500 <br /> 6.3 Talus 18,500 CY $14 $259,000 <br /> 6.4 Scour Berm 5,200 CY $10 $52,000 <br /> 7.0 Soil Conditioning 39 ACRE $190,729 <br /> 7.1 Soil Growth Medium 31,460 CY $5 $157,300 <br /> 7.2 Soil Amendments (300 Ibs/Acre) 11,700 LBS $3 $33,429 <br /> 8.0 Sedimentation Pond Reclamation 2,222 CY $10 $22,220 <br /> 9.0 Revegetation 39 ACRE $5,000 $195,000 <br /> Base Cost(Items 4.0-9.0) $8,137,949 <br /> Total Cost $9,602,780 <br />