Laserfiche WebLink
Page 5 of 157 <br />BLASTING MATERIALS QUANTITIES <br />Drilling Equipment - Drill: ATLAS COPCO ROC L6,6.0 in. <br />-Drill Pad Preparation: Cat D9T - 9SU <br />Misc. Drill Support Equipment: NA <br />Misc. Explosives Support Equipment: NA <br />Explosives Delivery Bulk Truck: ANFO Bulk Delivery Truck <br />-Can Truck: NA <br />Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Eauivment Prevaration Suvvort Suvvort Bulk Truck Can Truck <br />QUANTITY <br />UNIT <br />Total Quantity of Stemming Required: <br />9.98 <br />cubic yards <br />Total Quantity of Explosives Required: <br />16,827 <br />pounds <br />Total Quantity of det. cord/fuse/wire Required: <br />8,796 <br />linear feet <br />Quantity of Blasting Cas per Blasthole: <br />1 <br />ca (s) <br />Total Quantity of Blasting Caps Required: <br />332 <br />caps <br />Quantity of Primers per Blasthole: <br />1primer(s) <br />NA <br />Total Quantity of Primers Required: <br />332 <br />primers <br />Quantity of Delays per Blasthole: <br />1 <br />delay(s) <br />Total Quantity of Delays Required: <br />334 <br />delays <br />HOURLY EQUIPMENT COST <br />Shift basis: 1 per day <br />Drilling Equipment - Drill: ATLAS COPCO ROC L6,6.0 in. <br />-Drill Pad Preparation: Cat D9T - 9SU <br />Misc. Drill Support Equipment: NA <br />Misc. Explosives Support Equipment: NA <br />Explosives Delivery Bulk Truck: ANFO Bulk Delivery Truck <br />-Can Truck: NA <br />Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Eauivment Prevaration Suvvort Suvvort Bulk Truck Can Truck <br />Total work team cost/hour: $479.09 <br />MATERIALS COST <br />Drilling <br />Dozer <br />Unit Cost <br />Quantity <br />MiscTruck <br />%Utilization -machine: <br />100 <br />25 <br />NA <br />NA <br />15 <br />NA <br />Ownership cost/hour: <br />$50.03 <br />$72.57 <br />NA <br />NA <br />$67.53 <br />NA <br />Operating cost/hour: <br />$124.78 <br />$35.79 <br />NA <br />NA <br />$13.52 <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />NA <br />Operator cost/hour: <br />$39.50 <br />$38.01 <br />NA <br />NA <br />$37.36 <br />NA <br />Unit Subtotals: <br />$214.31 <br />$146.37 <br />$0.00 <br />$0.00 <br />$118.41 <br />$0.00 <br />Number of Units: <br />1 <br />1 <br />0 <br />0 <br />1 <br />0 <br />Group Subtotals: <br />$214.31 <br />$146.37 <br />$0.00 <br />$0.00 <br />$118.41 <br />$0.00 <br />Total work team cost/hour: $479.09 <br />MATERIALS COST <br />CIRCES Cost Estimating Software <br />Description <br />Unit <br />Unit Cost <br />Quantity <br />Total Cost <br />Bulk ANFO nom. density <br />Blasting Agent: <br />7,900-15,000 fps) <br />Pound <br />$0.234 <br />16827.481 <br />$3,937.63 <br />Cast primer, 0.3 lb <br />(electric or non -electric <br />Primers or Boosters: <br />system) <br />Each <br />$2.885 <br />332.000 <br />$957.82 <br />Non -electric cap, delay <br />Blasting Caps: <br />non -electrics stems <br />Each <br />$3.489 <br />332.000 <br />$1,158.35 <br />Detonating cord, 10 <br />Det. Cord, fuse, or <br />gr./ft. (non -electric <br />wire: <br />systems) <br />Linear foot <br />$0.119 <br />8795.600 <br />$1,046.68 <br />MS connectors (non - <br />Delays: <br />electric systems) <br />Each <br />$4.914 <br />334.000 <br />$1,641.28 <br />Miscellaneous: <br />0.000 <br />0 <br />Drill bits: <br />Bit life = 2,600 <br />Linear feet <br />$1,639.00 <br />1.149 <br />$1,883.59 <br />CIRCES Cost Estimating Software <br />