Laserfiche WebLink
Page 48 of 157 <br />SCRAPER TEAM WORK <br />Task description: Replace topsoil on 2.83 ac WFC property (Pond 013 - Zone 8) <br />Site: New Horizon Mine Permit Action: SL16 Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 30F State: Colorado Abbreviation: None <br />Date: 11/19/2015 County: Montrose Filename: C008 -30F <br />User: JDM <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COSTShift basis: 1 ver day <br />-Scraper: Cat 631G <br />-Dozer: Cat D9T - 9SU <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Cost Breakdown: Scraver Work Team Suvvort Eauivment Maintenance Eauivment <br />Total work team cost/hour: $1,794.19 <br />MATERIAL OUANTITIES <br />Initial volume: 21,307 CCY Swell factor: 1.100 <br />Loose volume: 23,438 LCY <br />Source of estimated volume: Map 2.05.4-7, 38" A/B, 18" sub <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs/LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />50 <br />50 <br />Ownership cost/hour: <br />$80.91 <br />$72.57 <br />NA <br />NA <br />$42.03 <br />$20.53 <br />Operating cost/hour: <br />$170.75 <br />$143.16 <br />NA <br />NA <br />$34.94 <br />$23.89 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$33.56 <br />$38.01 <br />NA <br />NA <br />$24.47 <br />$0.00 <br />Unit Subtotals: <br />$285.22 <br />$253.73 <br />NA <br />NA <br />$101.43 <br />$44.42 <br />Number of Units: <br />4 <br />2 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,648.34 <br />Support: <br />$0.00 <br />Maint: <br />$145.85 <br />Total work team cost/hour: $1,794.19 <br />MATERIAL OUANTITIES <br />Initial volume: 21,307 CCY Swell factor: 1.100 <br />Loose volume: 23,438 LCY <br />Source of estimated volume: Map 2.05.4-7, 38" A/B, 18" sub <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs/LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />