My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-24_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2016-06-24_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:21:10 AM
Creation date
7/1/2016 8:14:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
6/24/2016
Doc Name
Determination of Bond Amount
Section_Exhibit Name
Section 3.02.2 Determination of Bond Amount
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.60 Minutes <br />0.70 Minutes <br />Scraper Push Dozer Source <br />Altitude Ad': 1.000 1.000 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br />Page 43 of 157 <br />Site Altitude: 5700 feet <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />800.00 <br />0.83 <br />3.00 <br />3.83 <br />1667 <br />0.61 <br />Haul Time: 0.61 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />800.00 <br />-0.83 <br />3.00 <br />2.17 <br />2914 <br />0.47 <br />Return Time: <br />0.47 <br />minutes <br />Total Scraper team cycle time: <br />2.38 <br />minutes <br />Adjusted for job conditions: <br />606.81 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />1,213.61 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />2,427.23 <br />LCY/Hour <br />Unadjusted unit production/hour: 731.09 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Unit cost: $0.739 /LCY <br />Total job time: 301.24 Hours <br />Total job cost: $540,474 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.