My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-24_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2016-06-24_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:21:10 AM
Creation date
7/1/2016 8:14:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
6/24/2016
Doc Name
Determination of Bond Amount
Section_Exhibit Name
Section 3.02.2 Determination of Bond Amount
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
069 <br />070 <br />071 <br />075 <br />076 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />087 <br />088 <br />089 <br />090 <br />092 <br />093 <br />094 <br />095 <br />096 <br />097 <br />098 <br />099 <br />100 <br />30A <br />30B <br />30C <br />30D <br />30E <br />30F <br />36A <br />45B <br />51B <br />52B <br />53B <br />54B <br />Drill seed Dryland Pasture - No Release <br />REVEGE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />190.00 <br />Drill seed Irrigated Pastureland Swale - Phase II <br />granted <br />REVEGE <br />5.00 <br />Drill seed Irrigated Cropland - No Release - Green <br />Manure <br />REVEGE <br />111.92 <br />Mobilize equipment for inital reclamation - <br />breakdown req'd <br />MOBILIZE <br />25.77 <br />Mobilize large equipment for pond and ditch <br />reclamation <br />MOBILIZE <br />25.77 <br />Rip BB Road Detour <br />RIPPER <br />7.47 <br />Haul BB Road surface material to pit <br />TRUCKI <br />2.06 <br />Haul BB Road Fill Material <br />SCRAPERI <br />4.79 <br />Rip NE Haul Road surface <br />RIPPER <br />6.53 <br />Regrade NE Haul Road corridor <br />DOZER <br />25.19 <br />Rip SW Haul Road surface <br />RIPPER <br />7.37 <br />Re rade SW Haul Road surface material <br />DOZER <br />28.79 <br />Rip 5th Street surface (reclaimedportion) <br />RIPPER <br />1.46 <br />Regrade 5th Street surface material <br />DOZER <br />5.68 <br />BB Road Pavement/Gravel <br />SITEMAINT <br />ENANCE <br />0.00 <br />Compact 15' native material in base of <br />reconstructed BB road <br />COMPACT <br />88.82 <br />Compact 15' native material base of reconstructed <br />2700 Road <br />COMPACT <br />34.01 <br />Construct roadside ditches on reconstructed BB <br />Road <br />GRADER <br />16.41 <br />Construct roadside ditches on reconstructed 2700 <br />Road <br />GRADER <br />6.71 <br />Finish grade BB Road detour corridor <br />GRADER <br />6.37 <br />Irrigation of 423.85 acres <br />SITEMAINT <br />ENANCE <br />0.00 <br />Spoil Testing <br />SITEMAINT <br />ENANCE <br />0.00 <br />Weed Control over Liability Period <br />REVEGE <br />0.00 <br />Rill & Gully Repair/Road Maint. over Liability <br />Period <br />SITEMAINT <br />ENANCE <br />0.00 <br />Replace topsoil on 20.02 ac Morgan property, <br />Zones 1-2 <br />SCRAPERI <br />56.82 <br />Replace topsoil on 31.68 ac Morgan property Zone <br />3 <br />SCRAPERI <br />153.11 <br />Replace topsoil on 54.33 ac Morgan property Zone <br />4 <br />SCRAPERI <br />301.24 <br />Replace topsoil on 106.8 ac Lloyd/Benson property <br />Zone 6 <br />SCRAPERI <br />312.35 <br />Replace topsoil on 100.6 ac WFC/Lloyd property <br />Zone 7 <br />SCRAPERI <br />206.78 <br />Replace topsoil on 2.83 ac WFC property (Pond <br />013 - Zone 8) <br />SCRAPERI <br />8.40 <br />Replace topsoil on 10.17 acre area NE Sec 6 <br />SCRAPERI <br />15.24 <br />Replace topsoil BB Detour RD 2.83 ac Morgan <br />property Zone 3 <br />SCRAPERI <br />4.34 <br />Replace topsoil on Pond 009 <br />SCRAPERI <br />2.23 <br />Replace topsoil on Pond 010 <br />SCRAPERI <br />3.10 <br />Replace topsoil on Pond 011 <br />SCRAPERI <br />6.62 <br />Replace topsoil on Pond 012 <br />SCRAPERI <br />1.94 <br />Page 2 of 157 <br />$56,851.00 <br />$1,516.00 <br />$35,192.00 <br />$54,274.00 <br />$5,194.00 <br />$2,040.00 <br />$1,680.00 <br />$8,590.00 <br />$1,773.00 <br />$6,393.00 <br />$1,999.00 <br />$7,305.00 <br />$396.00 <br />$1,441.00 <br />$169,953.00 <br />$18,386.00 <br />$7,042.00 <br />$1,321.00 <br />$540.00 <br />$646.00 <br />$548,546.70 <br />$1,000.00 <br />$21,548.00 <br />$26,654.00 <br />$101,947.00 <br />$274,714.00 <br />$540,474.00 <br />$567,872.00 <br />$371,002.00 <br />$15,068.00 <br />$27,336.00 <br />$7,793.00 <br />$1,837.00 <br />$2,557.00 <br />$5,457.00 <br />$1,603.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.