Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 28 of 157 <br />N41 marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.89 <br />$2.89 <br />location/identification <br />marker (EA, material <br />cost only) <br />N42 cement <br />Portland cement <br />4 <br />7 <br />2.00 <br />bag <br />$11.83 <br />$23.66 <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />N42 bentonite <br />Granular bentonite <br />4 <br />36 <br />5.15 <br />bag <br />$10.19 <br />$52.48 <br />(Bag, material cost <br />only...50 lb. bag) <br />N42 casing <br />Exposed casing <br />4 <br />1.5 <br />2.50 <br />LF <br />$6.04 <br />$15.10 <br />removal - 4 to 6 in. <br />diameter steel pipe <br />(LF) <br />N42 marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.89 <br />$2.89 <br />location/identification <br />marker (EA, material <br />cost only) <br />N44 cement <br />Portland cement <br />4 <br />7 <br />2.00 <br />bag <br />$11.83 <br />$23.66 <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />N44 bentonite <br />Granular bentonite <br />4 <br />50 <br />7.15 <br />bag <br />$10.19 <br />$72.86 <br />(Bag, material cost <br />only ... 50 lb. bag) <br />N44 casing <br />Exposed casing <br />4 <br />1.25 <br />2.25 <br />LF <br />$6.04 <br />$13.59 <br />removal - 4 to 6 in. <br />diameter steel pipe <br />(LF) <br />N44 marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.89 <br />$2.89 <br />location/identification <br />marker (EA, material <br />cost only) <br />N45 cement <br />Portland cement <br />4 <br />7 <br />2.00 <br />bag <br />$11.83 <br />$23.66 <br />grout ( Bag, material <br />cost only... 4 lb. ba <br />N45 bentonite <br />Granular bentonite <br />4 <br />103 <br />14.73 <br />bag <br />$10.19 <br />$150.10 <br />(Bag, material cost <br />only...50 lb. ba <br />N45 casing <br />Exposed casing <br />4 <br />1.25 <br />2.25 <br />LF <br />$6.04 <br />$13.59 <br />removal - 4 to 6 in. <br />diameter steel pipe <br />LF <br />N45 marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.89 <br />$2.89 <br />location/identification <br />marker (EA, material <br />cost only) <br />2 man crew 2 <br />Flatbed Truck, 6x4, <br />NA <br />NA <br />12.00 <br />EA <br />$85.64 <br />$1,027.68 <br />hrs/hole <br />45K GVW <br />Job Hours: 3.00 Total Cost: $1,740.00 <br />CIRCES Cost Estimating Software <br />