My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-24_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2016-06-24_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:21:10 AM
Creation date
7/1/2016 8:14:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
6/24/2016
Doc Name
Determination of Bond Amount
Section_Exhibit Name
Section 3.02.2 Determination of Bond Amount
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 24 of 157 <br />MOTOR GRADER WORK <br />Task description: Rip spoil/topsoil interface <br />Site: New Horizon Mine Permit Action: SL16 Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 010 <br />Date: 11/19/2015 <br />User: JDM <br />State: Colorado <br />County: Montrose <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Abbreviation: None <br />Filename: C008-010 <br />Basic Machine: CAT 14M <br />1.50 <br />Horsepower: 259 <br />Ripper Attachment: Multi -Shank Ripper <br />Ripping (0-3 mph) - 1.50 <br />Shift Basis: 1 per day <br />-1 <br />degrees <br />Data Source: (CRG) <br />Cost Breakdown: <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Utilization % <br />Ownership Cost/Hour: <br />$45.44 <br />NA <br />Operating Cost/Hour: <br />$69.88 <br />100 <br />Ripper Operating Cost/Hour: <br />$3.56 <br />100 <br />Operator Cost/Hour: <br />$24.47 <br />NA <br />Total Unit Cost/Hour: <br />$143.34 <br />Job Efficiency: 0.90 (1 sh/d, fay.) <br />Total Fleet Cost/Hour: $143.34 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 20.00 acres <br />Source of estimated acreage: Map 2.05.3(3)-2 and Division Aerial Photographs <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Ripping (0-3 mph) - 1.50 <br />Selected Blade Angle: <br />-1 <br />degrees <br />Effective Blade Length: <br />0.00 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />8.50 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.5455 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 5700 feet <br />Source <br />Altitude Adj: 1.00 CAT HB) <br />Job Efficiency: 0.90 (1 sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />1.3909 <br />1.3909 <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: <br />acres/Hour <br />acres/Hour <br />14.38 Hours <br />Unit cost: $103.05 per acre Total job cost: $2,061 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.