Laserfiche WebLink
Demo Worksheet Cont'd <br />Task # TTT <br />Total Res <br />Page 18 of 157 <br />Truck Cycle Time: <br />(Ft) <br />(%) <br />(%) <br />Truck Exchange Time: 0.70 <br />Minutes <br />Adjusted for site altitude: <br />0.700 Minut <br />Truck Load Time: 1.585 <br />Minutes <br />Adjusted for site altitude: <br />1.585 Minute <br />Truck Maneuver and Dump 1.10 <br />Minutes <br />Adjusted for site altitude: <br />1.100 Minutes <br />Time: <br />-1.30 3.00 <br />1.70 <br />3448 <br />Truck Travel (Haul & Return) Time: <br />Road Condition: Firm, <br />smooth, rolling, dirt/It. surfaced, watered, <br />maintained 3.0 <br />Adjusted hourly truck team production: 663.29 <br />Haul Route: <br />Adjusted single truck/loader team production: 663.29 <br />Seg # Haul Distance <br />Grade (%) Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />2 4000.00 1.30 3.00 <br />4.30 <br />3540 1.130 <br />min <br />1 4000.00 <br />-1.30 3.00 <br />1.70 <br />3448 <br />1.655 <br />2 10000.00 <br />-1.30 3.00 <br />1.70 <br />3448 <br />2.900 <br />Haul Time: 4.555 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # Haul Distance Grade (%) Roll. Res <br />(Ft) (%) <br />Total Res <br />(%) <br />Velocity Travel <br />(fpm) Time <br />min <br />1 10000.00 1.30 3.00 <br />4.30 <br />3540 3.087 <br />2 4000.00 1.30 3.00 <br />4.30 <br />3540 1.130 <br />LCY/Hour Adjusted for job efficiency: <br />CIRCES Cost Estimating Software <br />Return Time: 4.217 <br />minutes <br />Total Truck Cycle Time: 12.157 <br />minutes <br />Loading Tool unit <br />Production <br />1,062.93 <br />LCY/Hour Adjusted for job efficiency: <br />882.23 LCY/Hour <br />Truck Unit Production <br />199.79 <br />LCY/Hour Adjusted for job efficiency: <br />165.82 LCY/Hour <br />Optimal No. of Trucks: <br />5 <br />Truck(s) Selected Number of Trucks: <br />4 Truck(s) <br />Adjusted hourly truck team production: 663.29 <br />LCY/Hour <br />Adjusted single truck/loader team production: 663.29 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 663.29 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 139.68 <br />Hours <br />Unit cost: <br />$2.324 <br />/LCY Total job cost: $215,289 <br />CIRCES Cost Estimating Software <br />