Laserfiche WebLink
Page 15 of 157 <br />Total Materials Cost: $633.79 <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br />Total Drilling Length: <br />135 <br />linear feet <br />Unadjusted Drilling Rate: <br />187.00 <br />feet/hour <br />Drilling Time: <br />1.14 <br />hours <br />Job Condition Corrections: <br />Site Altitude: <br />5,700 <br />feet <br />Altitude Adjustment: <br />0.95 <br />(DRMS est.) <br />Job Efficiency Factor: <br />0.67 <br />(CH. Exc. HB) <br />Adjusted Drilling Rate: <br />119.03 <br />feet/hour <br />Explosives Prep. Time: <br />4.45 <br />hours <br />JOB TIME AND COST <br />Total Job Time: <br />5.59 Hours <br />Unit cost: $1.494 per cu. yd. <br />Total Job Cost: <br />$1,571 <br />CIRCES Cost Estimating Software <br />