Laserfiche WebLink
U.S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />•'° State Program <br />I. Permittee/Person <br />9. Permit Number <br />22010089 <br />IL Field Visit Date <br />681/2016 <br />a -y mr <br />l it Status <br />A <br />17. OSM Office # <br />140 <br />20. M.S.H.A. ID # <br />I I <br />10. Permit Type <br />AP <br />12. Purpose 13. SRA Present <br />lop <br />15. Site_ Status I6. Facili pe <br />AP A <br />18. CCID # 19. Land Code <br />21. Slate Abbrev. 22. Cour /Burrough <br />F-c-51>uorrrxast <br />WESTERN FUELS -COLORADO LLC <br />2. Address <br />P.O. BOX 33695 <br />3. V 4. SO <br />DENVER CO <br />5. Zip Code 6. Phone Number <br />80233 1 1(303)254 3514 <br />7. Operator Name, if Different than Permittee <br />WESTERN FUELS -COLORADO LLC <br />8. Mine Name <br />i\EW HORIZON NORTH <br />25. Hours <br />3.0 a. Permit Review <br />b. Site Visit Time <br />12.0 c. Travel Time <br />4.0 d. Report Writing <br />26. Signature Block <br />5ignalum <br />23. AVS Permittee Entity ID Number 24. State Office <br />125767 10 <br />�27 evievin Official: <br />� gQitha <br />signal= <br />Christine Belkn,111I1182 I Review Date: 10,C -,Z')— <br />Printed Name rm-dd-Y yy <br />Dale: 161=2016 I Is Supplemental MSE Page Used YM ED <br />Qat. Oversight RFz. Reclamation Fees CC... Citizen Complain[ Wu ails vial[) <br />Aa...Asslatanrs Fzz Fed"Actions CCP Assistance <br />Joint Inspection - Kam 13 A Writ Peeboa Is when a Mate vapecurraccompanies an OSM napector at amu Oma dunna the review ol the mode Are <br />Permit Status - ken 14 AB Abandoned Al surface And underground coal mining artividas have mesad and oparator <br />A Aekve: Coal miring ectirides oamning or pormided but not yet has lett the silo without amooting rsdamatim as defined In 30 CFR 84011(g) <br />disturbed. A61 Bond Forfeiture: Bad larfalbae ofridefy In process or completed And reclamation In <br />IM Inactive jPeraartaut Program Permit): Phase 11 completed or progress or not yet commenced. <br />Temporary Cessation of Opomtbns (Interim Program PGM**): A92 Partially Reclaimed Forfeiture Forfeited she whero all bonds have been used to reclaim skis. <br />Coal mining completed and reclamation aelhillin Initiated. but alis net reclaimed to Program standards. <br />OR Bond Release: Reclamation completed and State Regulatory A83 Reclaimed Fodeihze Forfekad Allo that has been redained to Program standards. <br />Author WRA) has released ati of the bond (Phase IN Release) NA Not Applicable: Whan sits Is unpemticad. <br />Sae Status - Itam 16 MC Mining Complete No mining ec** on site. silo N9 Nan -Sita Visa; Stabs of AM not determined. <br />NO No Disturbance No coal mining And reclamation regraded and awaiting bond release. Forfeflum P&Wkw Tho RA Is pursuing actions to <br />operations have been started. TC Tomporaq Cessation: The RA has granted FP revoke the permit cotiacl Iia performance bond(s). <br />EX Coal Exploration. Coal exploration operations have ceasation of mining pursuant to 30 CFR andfor reclamation of forfaNad aft Is in progress <br />storied and wham coal mining operations have not 111W1117:13(b) FR Fadelled And Reclaimed- Forfalture reclamation <br />begun. P1 Phase I Release; At least Phase 1 bond release completed <br />AP Activa Coal Producing: Coal surface miring granted for entire permitted are@ For interim FO Abandoned Site: Abandoned site that Is permiked but <br />ams are occurring. permits. partial bond rebase them Is no bend. <br />AN AcIl" Non•Produdng Adiva nen produdng taelky P2 Phase Il Release: At least phase 11 bond release yyC Meet; Coal minting and reclamation operations have <br />such as fipple or preparation pleat for that enure pear iltad area. or are taking Place and Our activity is not cohered by <br />NM No Mining The Permit Statin h aciva site In not In P3 Phase III Release Reclamation completed and be regained permits from the RA. <br />Temporary Cessation, no surface coal mining the RA has released All bond <br />aeli ft, and site not regraded <br />Facility Typo Codes -Item It D. Jnndiary (Houlmad Comreyor, andfor Rail N Exploration Permits K»,.Government Financed Construction Exemption <br />A. Surface E Refuse andlor impoundmant 1. Notice of Intent to Explore L Reunining site permitted under 30 CFR 755.25 <br />a. Underground F t ceding Fadtity onftr TlppIa J .XxempI 15 and 213 <br />C. Preparation Plant a Stackpies <br />Small Business Regulatory Enforcement Falmoss Act (SOREFA) <br />Your nts we important <br />Thr Small auskwn end AnPbAra Rrpmdrmory Erdwaimerd Omand d 10 Re*nall Femrss 8=6 were ntat0s rd to nmeriw comm@rrs ham sm d bu*kntw abode Federal egrncy <br />rdorceno aeliaru The Ombummrr wa an NIy svrimte era rdonamsrmt aurirlrrA and rola aAdr egrmeyr mporWwnass h AtRW twslnan. ttyou ars a sere busknrsa p bm@irss wMh 500 a <br />hwaer"ye" Irmctuerrg thaw of Ananrrr) red wish o Ra not. On uM Ardoreamrra or eorrrpeanm *WvWn or 0511 W 13@A-REGFAiR (14M&73432/4 <br />