Laserfiche WebLink
,UA. DEPT. OF THE INTERIOR <br />�r� �m <br />s `, ot��so�»� &Sa�-OFFICE OF SURFACE MINING =r <br />Mine Site Evaluation <br />�'4'rc„State Program <br />1. Penuittee/Person <br />9. Pennit Number 10. Permit Type <br />C-8t•Ol2 PP <br />11. Field Visit Date 12. Purpose 13. SRA Present <br />('-- -� <br />L6i7_/2016-OC <br />14. Permit Status 15. Site Status 16. Facilit T pe <br />FA--] AN BCEI' <br />17. OSM Office k 18. CCID;c 19, Land Code <br />1140 I <br />20. M.S.H.A. 1D P, 21. State Abbrev. 22. Count /Burrough <br />05.00296 F r_O J tASAN1MA5 <br />23. AVS Permittee Entity ID Number 24. State Office <br />JIM034 <br />NFIV ELK COAL COMP ANY LLC <br />2. Address <br />12250111CI111'Al' 12 <br />3. City 4. State <br />11'ESTON CO <br />5. ZiD Code 6. Phone Number <br />A1091 (303)300-8718 <br />7. Operator Name, if Different than Pcrmittec <br />NE11' FIX COAL COMPANY LLC <br />8. Mine Name <br />NEIL' ELK <br />25. flours <br />4.0 a. Permit Review <br />23.0 b. Site Visit Time <br />6,0 c. Travel Time <br />B4O d. Report Writing <br />26. Signature Block <br />r ��-�tZ 1�� �.r�+ _..-.. <br />27.evicivin Ofiiclal: <br />f,�Y�t�t A <br />Signature <br />Signature <br />Review Date: G -1- -. Zo <br />Win, d'I 5111 <br />Is Supplemental MSE: Poge Used YIN El <br />Chrlstinc Belka, ID4182 <br />Printed Name <br />Date: 6/23/2016 <br />Permit Typo - hem 10 IP a Interim Program PP - Permanent Program NP o No Permit <br />Purpose Typo Codes • Item 12 CCR..C(Uzen Complaint Referral (non -site visit <br />oxx Oversight RFx. Reclamat on Fees CC ....ClUzen Complaint (Initial site visit) <br />Axx .Assistance Fxx FaderalActions CCF. Ass tance <br />JoIni Inspotdon • Item tocol imaction is w en a ata a nsnor accompanies an CSM Inspector at any time KwUie review of the mine site <br />Permit Statue - Ilam 14 AD Abandoned All surface and undarground coal mining activities have ceased and operator <br />A Active Coal mining activities occurring or permitted but not yet has left the site without completing reclamation as defined In 30 CFR 840.11(0) <br />disturbed Aril Bond Fodafto Bond forfeiture officially In process orcompleted and reclamation In <br />IN Inactive (Permanent Program Permit). Phase II completed or progress or not yet commenced <br />Temporary Cessation of Operations. (Interim Program Permit) AB2 Partially Reeialmed Forfeiture Forfeited site where all bonds have been used to facts m silo, <br />Coal mining completed and reclamation activities Initiated. but site not reclaimed to Program standards <br />DR Bond Release Reclamation completed and State Regulatory AW Reclnimed Forfelture Forfeited site that has been reclaimed to Program standards <br />Authority(RA) has released ail of the bond (Photo III Release). NA Not Applicable Man site Is unpermitted. <br />Site Status - Item 16 MC Mining Complete No mining activity on alto silo NS Non -Site Visit: Status of bile not determined <br />No No Disturbance: No coal min ng and reclamation regraded and awaiting bond release Forfeiture Pending The RA Is pursuing actions to <br />operations have bean started. TC Temporary Cessation The RA has granted FP revoke the permit, collect the performance bond(s), <br />EX Coal Exploration: Coal exploration operaborts have cessation of mining pursuant to 30 CFR and/or reclamation of forfeited site Is In progress <br />started and whew coal mining operations have not 8161817 13(b), FR Forfeited and Reclaimed Forfeiture redemntlon <br />begun P1 Phase I Release Al least Phase I bond relense completed <br />AP Active Coal Producing: Coal surface mining granted for entire permitted area For Intedm FO Abandoned Site Abandoned site that Is permitted but <br />aclivlUes are occurring. permits partial bond release there Is no bond. <br />AN Active Non•P(oduung, Actve non -producing facility P2 Phaso II Release At least Phase 11 bond release WC Mont. Coal mining and reclamation operations have <br />such as Upp'o or proparatlon plant. for the endre permitted area or are taking place and the activity Is not covered by <br />NM No Wning The Permit Status Is acUve, site Is nol In P3 Phrase III Release Redamolion completed and the required permits from the RA <br />Temporary Cessation, no surface coal mining the RA has released al bond <br />activity and site not regraded. <br />Facility Type Codes -11911316 D..Aric0lary(Houirood. Conveyor, andfor Rads H Exploration Permits K....Government Financed Construction Exemption <br />A Surface E. Refuse and/or Impoundment I Notice of Intent to Explore L....Remining site permitted under 30 CFR 765 25 <br />B Underground F... loading Facility endfor Tipple J ,Exempt 16 and 2)3 <br />C Preparation Plant (i,,..Stockpiles <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments are Impatient <br />The Sinal au0%6$$ end AgnCadura Regulatory Ervorument Omtwdsmen end 10 Regional Fairness Boards were estabtsned to naive comments from ema:l businssres howl Fedefel agency <br />entomenWI actions The Omoudsman *I annua:ty avoiato the ardoicemenl actrolas and rata each agency's rasponsfvaness to anal bus nass. If you are a smal bus:ness (a buriness win Soo or <br />r9.wer errptoyaes Indud�ng those of s'M1aUs' and wish to carttmMd m e» erdcrcemsnl a mmpliarxe acliv;Ces of OSM rat 1.088 REG -FAIR (1.889-734-3247) �..- <br />