Laserfiche WebLink
Greg UiNicld And Associates, PLLC <br /> 11-441 NNaning4on Court Phone- (30)346- Fax(3Qi}3t6-6934 <br /> Parker, CT) USA SH 38 E-Mail: inf0Xa1e�,,icw biz <br /> June 21, 2016 <br /> Amy Yeldell <br /> Colorado Division of Reclamation, Mining, and Safety <br /> 1313 Sherman St, Room 215 <br /> Denver, CO 80138 <br /> Grand River Pit(M-2006-046) Technical Revision Application <br /> Phasing of Operation and Incremental Bonding <br /> Dear Ms. Yeldell <br /> Western Slope Materials, the operator of the Grand River Pit near Silt, CO are submitting a <br /> technical revision application for said operation. This application is to implement incremental <br /> bonding for the site,based on the phased nature of the operation. The Table 1 below shows the <br /> current disturbance on site in terms of the phases shown on Exhibits C-2 and F in the currently <br /> approved permit. <br /> Table 1 —Status of Operation Phases <br /> Phase Activity Disturbed Area(acres) <br /> iB Previous mining area ; <1 acre <br /> 2 Current mining area 16.4 acres <br /> 3A Production Area(no mining) 20.7 <br /> 313 Undisturbed 24.34 <br /> All mining activity, regardless of phase, is limited to 1000 feet of unbackfilled highwall. Therefore, <br /> the maximum possible backfilling needed is that required to take a vertical slope to 31-1:1 V for a <br /> height of 25 feet, and along a distance of 1000 feet. The topsoiling requirements of the site area <br /> based on a combination of this 1000 feet, and the ancillary disturbed areas in the worst case <br /> scenario. <br /> As shown in Table 1, no ground water has been exposed in the largest planned mining area(Phase <br /> 3A), therefore, the worst case reclamation scenario is the current situation on site: Phases 1B and 2 <br /> must be dewatered to complete reclamation. No ground water can be exposed in Phase 3A until <br /> Phase 2 reclamation is complete. Western Slope Materials will provide DRMS with a status of each <br /> mining phase in the annual report it files. This status will include the disturbance area within the <br /> phase, whether or not groundwater is exposed/pumped, and what revegetation has been completed. <br />