My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-27_GENERAL DOCUMENTS - M1977493
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
2016-06-27_GENERAL DOCUMENTS - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2020 10:44:00 PM
Creation date
6/28/2016 12:17:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
General Documents
Doc Date
6/27/2016
Doc Name
Asbestos Exposal Site Exemption
From
Climax Molybdenum
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan, Elevations & Sections, " Drawing No. 03-G-11A. A <br /> HEPA fan and filter will be installed on the southeast <br /> wall of the building to provide a slight negative draft <br /> while bags are being disposed.. The filter will screen out <br /> asbestos fibers , should they be present. Used filter <br /> media will also be disposed in the shaft when required. <br /> An access. door for bags of asbestos will be installed on <br /> the northwest side of the building along with a roller <br /> conveyor to facilitate moving the bags over the shaft <br /> opening. (A hopper may be used in place of the rollers <br /> should this appear to be more workable) . When bags are <br /> being disposed no personnel will be in the building. When <br /> bags are not being disposed, all access doors will be <br /> closed and locked to prevent unauthorized entry into the <br /> building. <br /> After disposal of asbestos is completed the enclosure <br /> building will be cleaned and demolished. Demolition <br /> residue will be placed in the shaft. Necessary fill will <br /> be added and a clay cap installed. The surface will then <br /> be graded and prepared to comply with the requirements of <br /> the Climax reclamation plan. The site will be suitably <br /> marked so that asbestos will not be dug up by mistake. <br /> This completes the description of the proposed plan to <br /> dispose of asbestos at Climax. If you should have any <br /> questions or require further information, please contact <br /> me at 231-0683. We will keep you informed of our progress <br /> and look forward to working with you on this program.. <br /> Sincerely, <br /> Robert J. Gosik w <br /> Manager, Environmental Engineering <br /> RJG/tce <br /> Enclosures <br /> cc: 4,c cyKtlborjr,_ <br /> w/o enclosures: Edward Bischoff, Colorado Mine <br /> Land Reclamation Division <br /> W. Alloway <br /> R. Austermann <br /> J. Todd <br />
The URL can be used to link to this page
Your browser does not support the video tag.