Climax Molybdenum Company HENDERSON MINE & MILL SWMP <br />Empire & Parshall, CO December, 2011 <br />Page 5-2 <br />• Reseed disturbed soil areas with maintenance seed (if it is temporary) or Climax Seed <br />Mix (for permanent or final construction). <br />• Install mulch, excelsior blankets or reseed areas on disturbed slopes greater than 3:1 <br />and consideration should be given to installation on slopes between 5:1 and 3:1 on a <br />case by case basis depending on the length, exposure, and texture of the soils on the <br />slope. <br />• Avoid slopes steeper than 2:1 and when unavoidable, rock protection (riprap) or <br />excelsior mats with netting shall be installed. <br />• Install rip-rap and at least 6-inches of suitable bedding in all water flow channels <br />where the design flow will exceed ~2 feet per second. Generally, suitable bedding <br />ranges from a minimum diameter of sand to a maximum diameter of 2-3 inches of <br />coarse, granular soils. <br />• Furrow contour side hill slopes whenever suitable equipment is available. Otherwise, <br />final grading shall be performed in a manner that will result in tracks and depressions <br />contoured across the slope instead of a down “fall-line.” This will not only minimize <br />wind erosion, but will also “roughen” the earth to provide a microclimate of wind <br />protection for new plants, and will help conserve precipitation for use in growth of <br />new seed. <br />• Minimize the time that bare soil is exposed. <br />• Install check dams and water bars wherever the slope exceeds approximately two <br />percent (~2%) to reduce water velocities and erosion potential in constructed swales <br />and channels. Riprap linings shall be installed in steeper slopes or where the velocity <br />exceeds two (2) feet per second. <br />• Minimize the disturbance of existing vegetation. <br />• Reseed and apply mulch as soon as possible to disturbed areas where erosion is <br />probable. Mulch may be natural, consisting of slash, brush, manure and vegetation <br />previously chipped and stockpiled; and/or clean straw, free from noxious weed seed, <br />mold, and other harmful elements; or wood cellulose fiber. <br />• Apply erosion control mats to all cut slopes steeper than 3:1. Staples shall be installed <br />at a maximum spacing of 4 feet. Mats shall overlap on the ends and sides at least 6 <br />inches. Regular duty excelsior mats shall be used for slopes less than 2:1. Heavy duty <br />excelsior or jute mats shall be used for slopes greater than 2:1. <br />• Where erosion scarps have developed (particularly along the faces of flood detention <br />structures), loose granular material shall be removed and the scarp filled with suitable <br />soils to the original profile of the bank or slightly above the original profile. If the <br />scarp is not completely filled, the steeper area at the brow of the scarp will encourage <br />erosion and may cause redevelopment of the scarp. The area upstream from the scarp <br />shall be carefully inspected to determine if there was an irregularity in the ground <br />profile that caused storm water to concentrate and erode the soils. Any such <br />irregularity shall be removed by the most appropriate BMP listed herein. <br />• Cover soils known to have a relatively high erosion potential with coarser textured <br />erosion resistant soils and mulch/reseed the topsoil. <br />• Where feasible, bypass live stream flows around construction sites during earthwork <br />activities by installation of temporary (or permanent) pipes or rock lined ditches.