Laserfiche WebLink
U.S. DEPT. OF THE INTERIORj1`�''t� <br />C OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />4� ,•a° State Program 1C1IFEWO <br />1, Permittee/Person <br />19. Land Code <br />9. Permit Number <br />C-81-013 <br />11. Field Visit Date <br />G/9Q016 <br />14. Permit Status <br />AO <br />I <br />12. Purpose <br />OC <br />15. Site Status <br />MC <br />10. Permit Type <br />PP <br />13. SRA Present <br />16. Facili T pe <br />p t <br />NE1V ELK COAL COMPANY LLC <br />2. Address <br />12250 HIGHWAY 12 <br />24, State Office <br />3. Ci 4. State <br />1YESTON CO <br />5. ZIO Code 6. Phone Number <br />8109) (303)300.8718 <br />7. 0 erator Name, irDifferent than Permittee <br />NEW ELK COAL CODIPANY LLC <br />8, Mine Name <br />GOLDEN EAGLE <br />25, Hours <br />4.0 a. Permit Review <br />2.0 b. Site Visit Time <br />6,0 c. Travel Time <br />2.0 d. Report Writing <br />On Ovemight <br />An .Assistance <br />26. Signature Block <br />17, OSM Office Y 1^8. CCID N <br />19. Land Code <br />I40 L.�—J <br />has left the site without completing reclamation as defined In 30 CFR 04011(g) <br />20. M.S,H.A. ID N 21. State Abbrev. 22. Court /Bufrough <br />05.02820 CO 1usAHtuAs <br />IN Inactive (Permanent Program Permit): Phase II completed or <br />23. AVS Permiltee Entity ID Number <br />24, State Office <br />15803.1 <br />0 <br />27. Reviewing O tial <br />Signature <br />Christine 0e111, 108182 I Review Date: 0 —Z --Zo 4 <br />Printed Nema <br />Date: 6/ZJ/ZOl6 I Is Supplemental MSE Page Used YIN FY <br />RFa..Redamelion Fees <br />CCF .Assistance <br />Permit Status. Ham 14 <br />AS Abandoned All surface and underground coal mining ectiviees he" ceased and operator <br />A Active Coal mining activities cecunng or permitted but not yet <br />has left the site without completing reclamation as defined In 30 CFR 04011(g) <br />disturbed <br />ABI Bond Fodelturo Bond forfeiture officially In process of completed and mclemetion In <br />IN Inactive (Permanent Program Permit): Phase II completed or <br />progress or not yet commenced <br />Temporary GssatIon of Operations. (Interim Program Permit): <br />A62 Parlielly Reclaimed Forfaitun Forfsllad she where all bonds have been used to rodaim e to <br />Coal mining completed and reclamation activities Initiated. <br />but ails not reclaimed to Program standards <br />BR Bond Release Reclamation completed and State Regulatory <br />A53 Reclaimed Ferfeitura Forfeited site thathas been reclaimed to Program standards <br />Aullwrily(RA) has released all of the bond (Phase III Release). <br />NA Not Applicable Men site Is unpermitted. <br />one bums - tum m <br />MC Mining Compete: No inning a"ty on site. site <br />NS Non -Ste Yoie Status of she not determined. <br />NO No Disturbance No coal m ding and mdamation <br />regraded and awaiting bond rebase <br />Fodekum Pending. The RA le pursuing adkins to <br />operations have been started. <br />TC TemporaryCessation The RAhasgrented <br />FP revoke the permit coped the performance bond(s). <br />EX Coal Exploration Coal exploration operations have <br />cessation of mining pursuant to 30 CFR <br />and/or reclamation of forfelted site is in progress <br />started and where coal mining operations have not <br />816/817:13(b). <br />FR Forfeited and Reclaimed Forfeiturerademation <br />begun <br />Pt Phase I Release: At least Phase I bond release <br />competed <br />AP Active Coal Producing Coal surface mining <br />granted for entire permitted area For Interim <br />FO Abandoned Site Abandoned site that Is pernilled but <br />activities aro occurring <br />permits, partial bond release <br />there la no bond <br />AN Active Non -Producing Active non -producing facihy <br />P2 Phase II Release: At least Phase II bond release <br />WC VdIdsat Coal mining and reclamation operations have <br />such es Upple or preparation plant <br />for the mare permlHed area. <br />or are taking place and the activity Is not covered by <br />Nh1No Mining The Pend Status B active, site Is not In <br />P3 Phase III Release, Redsmatlnn compleled and <br />the required permits from the RA. <br />Temporary Cessabon. no surface coal mining <br />the RA has released all bond <br />adivdy, and site not regraded <br />Facility Type Codes - Nem 16 D....Ana7lary(Haulmad,Cm"yor,endtw Ra7s H. EXpioretion Permits K. Govemmenl Financed Construction Exemption <br />A.,Surface E .... Refuse and/or Impoundment I Notice of Intent to Explore L. Remining site permdted undar30CFR785.25 <br />B Underground F. ... Loading Facility and/or Tipple J ,Exempt 16 and 213 <br />C. Preparation Plant 0....Stockpees <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments are hnuodanl <br />.so brnrnesrea slum Federal "" <br />am a vital busing a (e "Ines. wire ea0 or <br />cmnplente ateNaao of DSM call 1468 -REG -FAIR <br />