My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-23_INSPECTION - C1981012
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981012
>
2016-06-23_INSPECTION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:24:06 PM
Creation date
6/24/2016 8:22:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Date
6/23/2016
Doc Name
OSM Inspection Report (Emailed)
From
OSM
To
DRMS
Inspection Date
6/7/2016
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 | Page <br />sediment pond or containment area clean-out activities. <br />The interface between the reclaimed an un-reclaimed portions of the RDA was generally in good <br />repair although evidence of past drainage control problems is still evident. Straw wattles have <br />been placed along the eastern half of the interface but are not properly overlapped or keyed in. <br />However, the outer berm is now intact and drainage would flow away from the edge toward the <br />interior of the contour ditch. This diversion is close to requiring maintenance but is functional at <br />this time. An old small rill is present in the reclaimed bench on the eastern end of the interface. <br />This rill appears to be self-healing and does not cut down through the topsoil to refuse material. <br />Vegetation is establishing, and so bringing heavy equipment in to repair this feature would likely <br />be counterproductive. OSMRE and DRMS staff agreed that placing brush in the rill would be the <br />best way to encourage the feature to self-heal. <br />Sumps on both sides of the un-reclaimed RDA area are functioning to trap sediment before <br />drainage is routed down the side drains to Pond 008A. These sumps are easier to access and <br />clean than the pond. Both contained large amounts of coaly sediment, but the eastern sump is <br />smaller and should either be cleaned soon or enlarged to increase capacity. However, these <br />sumps are not designed sedimentation ponds and keeping them clean is simply in NECC’s <br />interest because it extends the time between Pond 008A cleanings (not a compliance issue). <br />The uppermost reclaimed contour ditch on the RDA had a slope of approximately 1%. <br />Vegetation is well-established on the reclaimed face, with trees establishing on the lowest bench. <br />A high proportion of bindweed (a List C weed) was noted on the reclaimed face, but vegetation <br />was otherwise good. Erosion was noted to the east of the RDA below the conveyor corridor. This <br />area is very steep and drains to Pond 008A. Although the surface was not disturbed by mining <br />activities, the area is contributing sediment to the pond and should be stabilized. <br />The reclaimed development coal waste pile (DCWP) was in good condition at the time of <br />inspection. Small patches of sparse vegetation and List C weeds (cheat grass and bindweed) were <br />noted, especially near the top of the reclaimed DCWP. No erosive features were found. The <br />DCWP is stable and water is routed off the pile as designed. <br />Erosion control practices on reclaimed coal mine waste banks are discussed in more detail in a <br />separate topic-specific oversight evaluation report. <br />The development waste disposal area #2 (DWDA#2) is constructed but un-reclaimed at this time. <br />Perimeter berms are in place and well-maintained. NECC has constructed a sump to catch <br />sediment prior to routing drainage into Pond 007. Sumps are generally easier to clean than <br />ponds, but access is limited here and sediment is accumulating at the outlet culvert. NECC has <br />placed material on the west end presumably to dry. Water is trapped within the end dump piles. <br />Although this is not a problem from a regulatory standpoint, this does not achieve NECC’s <br />desired effect of drying the material prior to permanent placement. <br />The stream-side embankment of DWDA #2 is well-bermed and marked on the outside as a <br />stream buffer zone. There is coaly material on the outslope in this area within the buffer zone. <br />This area was disturbed and coal material was left on the ground prior to the enactment of the
The URL can be used to link to this page
Your browser does not support the video tag.