Laserfiche WebLink
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />STATE Or COLORADO <br />COLORADO <br />D IV[ S ION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />May 30, 2013 Executive Director <br />Loretta Pifieda <br />Marvin Moore Director <br />Moffat County <br />1570 Ranney Street <br />Craig, CO 81625 <br />RE: Refuge Pit #1 ; DRMS File No. M -1989-112,112c Conversion Application <br />Adequacy Review #1 <br />Dear Mr. Moore, <br />The Division of Reclamation, Mining and Safety has completed its preliminary adequacy review <br />of your 112c construction materials reclamation permit application. The application was received <br />on April 12, 2013 and called complete for review on April 14, 2013. The decision date for this <br />application is July 15, 2013. Please be advised that if you are unable to satisfactorily address any <br />concerns identified in this review before the decision date, it will be your responsibility to <br />request an extension of the review period. If there are outstanding issues that have not been <br />adequately addressed prior to the end of the review period, and no extension has been requested, <br />the Division may deny this application. <br />The review consisted of comparing the application content with specific requirements of Rule 3, <br />6.1, 6.2, and 6.4 of the Minerals Rules and Regulations of the Colorado Mined Land <br />Reclamation Board for the Extraction of Construction Materials (Rule(s)). Any inadequacies are <br />identified under the respective exhibit heading along with suggested actions to correct them. <br />6.4 SPECIFIC EXHIBIT REQUIREMENTS — REGULAR 112c OPERATIONS <br />The following items must be addressed by the applicant in order to satisfy the requirements of <br />C.R.S. 34-32.5-101 et seg. and the Mineral Rules and Regulations of the Mined Land <br />Reclamation Board: <br />6.4.4 EXHIBIT D — Mining Plan <br />1) While excavating, will a highwall be created? If so, please specify the maximum length <br />and height the highwall will be at any given time during the operation. Please specify <br />what angle the highwall will be (vertical, 1:1, 4:1 etc.). <br />Office of <br />Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />