My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-15_INSPECTION - M1977141 (2)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977141
>
2016-06-15_INSPECTION - M1977141 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2020 11:08:58 PM
Creation date
6/21/2016 10:03:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
INSPECTION
Doc Date
6/15/2016
Doc Name
Corrective Action Response - Hydrologic Balance
From
Aggregate Industries
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Tracy Kosloff <br /> Re:Lyons Quarry SHISP Reneival Request <br /> May 25, 2016 <br /> Page 3 of 4 <br /> the point of depletion fi•on the pond, therefore no transit loss needs to be assessed on the <br /> replacements. <br /> Deliveries of C-BT water through the St. Vrain Supply Canal can only be made during the <br /> irrigation season, generally ending in October. As shown on Table 1, the replacements are <br /> sufficient to replace all depletions during the irrigation season and on an annual basis. <br /> Replacement water that could deliver to the required reach during the non-irrigation season of <br /> November through March could not be secured from the City of Longmont or the Saint Vrain <br /> I.etl Hand Water Conservancy District, and we are not aware of any other possible sources of <br /> augmentation water at this location. The volunic of depletions during this period (which impact <br /> the stream at a rate of 0.3 gpm or less) is small and will not appreciably reduce natural <br /> streamflow in St. Vrain Creek. Aggregate proposes to significantly over replace its depletions to <br /> the stream during the irrigation season in order to make tip for the small unreplaced depletions <br /> that will occur during the non-irrigation season. <br /> OPERATION OF PLAN <br /> Depletions to the stream will be assumed to equal the values presented in Table 1. Aggregate <br /> will coordinate with the local Water Commissioner and NCWCD on releases of C-BT water to <br /> provide replacements during the irrigation season. Water accounting will be prepared and <br /> submitted to the Division of Water Resources on a monthly basis. The following person will be <br /> responsible for the accounting during the requested approval period: <br /> Jared Dains, P.E.,Applegate Group, Inc. <br /> 1490 West 121"Avenue, Suite 100 <br /> Denver, CO 80234 <br /> (303)452-6611 <br /> iareddains @ applegategroup.com <br /> Tile Lyons Quarry does not currently have a well permit. A well permit application for the site <br /> will be submitted under a separate letter. <br /> CONCLUSION <br /> On behalf of Aggregate Industries -- WCR, Inc., Applegate Group, Inc. requests renewal of the <br /> Lyons Quarry substitute water supply plan pursuant to C.R.S. §37-90-137(l1). The requested <br /> approval period for this SWSP renewal is May 1, 2016 through March 31, 2017. The specifics <br /> of this plan renewal are as follows: <br /> • Total depletions during the requested approval period are estimated to equal 0.52 <br /> acre-feet. <br /> • The primary replacement source will be a 2.0 acre-feet lease of C-BT water from the <br /> City of Fort Collins. <br />
The URL can be used to link to this page
Your browser does not support the video tag.